Skip to main content

RFQ for Knik Arm Crossing toll bridge in Alaska

The Knik Arm Bridge and Toll Authority (KABATA) has issued a Request for Qualifications (RFQ) for concessionaires to design, construct, finance, operate and maintain the Knik Arm Crossing under an availability payment public-private partnership. Statements of Qualifications (SOQ) are due 15 September, 2011 at 4:00PM Alaska Daylight Saving Time. The RFQ can be downloaded at http://notes4.state.ak.us/pn/pubnotic.nsf or interested parties can receive the RFQ by contacting Michele Casey at michele.casey@alaska
April 19, 2012 Read time: 2 mins
RSSThe Knik Arm Bridge and Toll Authority (KABATA) has issued a Request for Qualifications (RFQ) for concessionaires to design, construct, finance, operate and maintain the Knik Arm Crossing under an availability payment public-private partnership. Statements of Qualifications (SOQ) are due 15 September, 2011 at 4:00PM Alaska Daylight Saving Time.  The RFQ can be downloaded at http://notes4.state.ak.us/pn/pubnotic.nsf or interested parties can receive the RFQ by contacting Michele Casey at [email protected].

The Knik Arm Crossing is a planned toll bridge and associated roadway crossing Cook Inlet between Anchorage - Alaska’s largest city, and the Matanuska-Susitna Borough – one of the fastest growing ‘counties’ in the US. Information about the Knik Arm Crossing Project and KABATA can be found on KABATA’s website at www.knikarmbridge.com.

KABATA expects to short list qualified proposers by the middle of October 2011, followed by issuance of a Request for Proposals at the end of the first quarter 2012.  The current project schedule anticipates financial close in time for the 2013 construction season.

Related Content

  • Qualcomm and Renault sign MoU on wireless EV charging technology
    July 25, 2012
    Qualcomm and Renault have announced a memorandum of understanding (MoU) for their intended cooperation on the London trial of Qualcomm Halo Wireless Electric Vehicle Charging (WEVC) technology, and their intent with respect to conducting preliminary studies of the integration of this technology into Renault vehicles.
  • More than 3,000 GB road bridges are ‘substandard’
    March 10, 2017
    More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation. Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network. Many o
  • New York State Thruway AET begins operations
    May 12, 2016
    The Kapsch TrafficCom all-electronic toll (AET) system at the Tappan Zee Bridge went live and began collecting toll revenue on 24 April in South Nyack, on the 570-mile New York State Thruway. Kapsch installed this multi-lane free-flow AET system for the New York State Thruway Authority (NYSTA), which operates and manages the bridge, over the winter after the system successfully passed a series of commissioning and integration tests. The on-schedule opening of these tolled, cashless traffic lanes elimi
  • Further motorway construction win for Strabag in Poland
    March 7, 2016
    Construction group Strabag has been awarded a contract to build a further section of the A1 motorway in Poland. Following the award of the construction of the Woźniki–Pyrzowice section, the group will now build the 16.7 km long stretch between the Zawodzie Junction and Woźniki Junction. The project, which has a value of US$118 million (€108 million), is expected to be opened to traffic in the second half of 2019.