Skip to main content

Q-Free wins its second tag order from South Africa in as many months

Q-Free has received its second multi-million dollar tag order from ETC, a joint venture led by Kapsch TrafficCom in South Africa, for use on the Gauteng Freeway Improvement Project.
February 2, 2012 Read time: 1 min
108 Q-Free has received its second multi-million dollar tag order from ETC, a joint venture led by 81 Kapsch TrafficCom in South Africa, for use on the Gauteng Freeway Improvement Project. This major project will see multilane open road tolling (ORT) on 185km, in phase one, on freeways in Gauteng Province. The value of the latest order for Q-Free is US$3.58 million and follows the US$4.6 million tag contract placed with the company just over two months ago.

Related Content

  • February 3, 2012
    South Africa's first multi-lane free-flow tolling top of the line
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • January 6, 2016
    Varying acceptance of tolling in Africa
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • January 6, 2016
    Varying acceptance of tolling in Africa
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • January 6, 2016
    Test 7th January 2016 News 1
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam