Skip to main content

Puerto Rico deals

The authorities in Puerto Rico awarded a contract to a consortium for two toll roads under a 40 year deal. The joint venture partnership comprises Spanish firm Abertis and Goldman Sachs' GS Global Infrastructure Partners II. The deal concerns the 83km PR22 road and the 8km PR5 road. The PR22 link is a major route with up to 10 lanes at its widest point while the urban PR5 road runs from PR22 to the western suburbs of San Juan.
April 19, 2012 Read time: 2 mins
RSSThe authorities in Puerto Rico awarded a contract to a consortium for two toll roads under a 40 year deal. The joint venture partnership comprises Spanish firm Abertis and 5029 Goldman Sachs' GS Global Infrastructure Partners II. The deal concerns the 83km PR22 road and the 8km PR5 road. The PR22 link is a major route with up to 10 lanes at its widest point while the urban PR5 road runs from PR22 to the western suburbs of San Juan. However further deals are in hand in Puerto Rico and the authorities intend to award three further road lease deals in due course. The next package will be for the PR52 and PR20 roads and the third for toll roads in the eastern part of Puerto Rico. The fourth concession will be for a new-build highway project and involve a construct and operate contract for an extension of the existing PR22 highway.

For more information on companies in this article

Related Content

  • International tolling organisations sign joint declaration
    May 29, 2013
    The European Association of Operators of Toll Road Infrastructures (ASECAP) and the International Bridge, Tunnel and Turnpike Association (IBTTA), the worldwide association for the owners and operators of toll facilities and the businesses that serve them have signed an international joint tolling declaration designed to support a wider application of tolling policies throughout Europe and North America. The joint declaration calls for an increase in advocacy and application of tolling policies to support i
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Growing traditional and P2P car sharing services key to future of urban mobility in Europe – web conference
    July 5, 2012
    New research by Frost & Sullivan reveals that there were more than 0.7 million members in Europe alone who adopted car sharing as a sustainable transport solution for daily travelling at the end of 2011. Car OEMs as well as transport operators have started to get active in this market, increasing competition for already existing market players.
  • 780 SolarLite road studs deployed on UK motorway accident black spot
    July 11, 2012
    An unlit stretch of the M42 motorway in the UK, identified as an accident black spot area due to the lack of street lighting linked to increased accident rates, has seen the installation of 780 Astucia SolarLite road studs. The studs, along the carriageway of the M42 from junctions 1 to 3a, give drivers up to 900 metres visibility of the road layout ahead, which is up to ten times greater than would be possible from traditional retro-reflective ‘cats eye’ road studs. In addition, the existing two metre whi