Skip to main content

Pennsylvania Turnpike to launch open road tolling in 2027

Customers will only need an E-ZPass transponder in preparation for the launch
By David Arminas August 13, 2024 Read time: 2 mins
PA Turnpike will begin removing toll plazas in the eastern sections in 2025 (image: Commonwealth Media Services)

The Pennsylvania Turnpike Commission will start converting its tolling system to open road tolling east of Reading city and on the Northeast Extension in January 2025

The announcement caps a 15-year transition, said the commission.

PA Turnpike will begin removing toll plazas in the eastern sections in 2025. Open road tolling construction west of Reading is getting underway and the system will be fully operational there in early 2027, the commission said.

"The advent of open road tolling will advance safety and allow for the safe movement of vehicle traffic across our network,” said Michael Carroll, chairman of PA Turnpike and secretary of Pennsylvania DoT. 

“Pennsylvania is the great ‘American Getaway’ and open road tolling will get travelling members of the public to destinations across our great commonwealth in a safe an efficient manner.”

In an open road system, tolls are charged electronically as customers drive at highway speeds without slowing down or stopping beneath gantries located between interchanges. Equipment on the gantry and in the roadway processes E-ZPass or toll-by-plate transactions. Beyond properly mounting an E-ZPass transponder, customers will not need to do anything differently in preparation for the launch.

PA Turnpike also said that new access and increased convenience mean freight will move more efficiently and enable the expansion of economic development to more communities. The system also eliminates confusion and lane-switching associated with traditional, stop-and-go tolling.

Removal of toll booths removes obstacles and increases sight lines for customers reducing stress and distraction when entering and exiting the system. Also, removal of current toll booths and additional infrastructure at interchanges will see the return of green space along the system.

Non-stop travel also means lower emissions, less fuel use, and a cleaner environment. PA Turnpike’s transition to cashless tolling in 2020 resulted in a 45% systemwide reduction in CO₂ emissions. Open road tolling is anticipated to further reduce emissions by another 7% by 2030.

For more information on companies in this article

Related Content

  • Missouri’s Road to Tomorrow provides ITS answers
    December 22, 2015
    Andrew Bardin Williams looks at Missouri’s plans to become America’s ITS testbed The state of Missouri launched its Road to Tomorrow initiative earlier this summer at the ITS America Annual Meeting and Expo in Pittsburgh, rolling out the welcome mat for transportation officials to try out new, innovative ITS technologies in the field.
  • Drivewyze PreClear now operational at over 200 weigh stations
    February 26, 2013
    Transportation technology provider Drivewyze installed its 200th Drivewyze PreClear weigh station bypass service with the activation of the Corinth site in Mississippi, USA. Drivewyze PreClear bypass services work at both permanent and temporary inspection locations, providing service plans catered to both short haul and long-haul carriers travelling intrastate or interstate throughout the United States. According to Drivewyze, by matching service plans to customer profiles, it delivers bypass services to
  • Government green lights road and rail improvements
    July 19, 2013
    UK Transport Secretary Patrick McLoughlin has confirmed a £1.2 billion order for more state of-the art trains to transform rail travel on one of Britain’s busiest intercity routes. The 270 carriages will be manufactured in Britain by Hitachi Rail Europe as part of the government’s overall £5.8 billion Intercity Express Programme (IEP). The trains will operate on the East Coast Main Line from 2019 and will deliver significant benefits to passengers, including boosting capacity by 18 per cent, improving trai
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency