Skip to main content

Pennsylvania Turnpike to launch open road tolling in 2027

Customers will only need an E-ZPass transponder in preparation for the launch
By David Arminas August 13, 2024 Read time: 2 mins
PA Turnpike will begin removing toll plazas in the eastern sections in 2025 (image: Commonwealth Media Services)

The Pennsylvania Turnpike Commission will start converting its tolling system to open road tolling east of Reading city and on the Northeast Extension in January 2025

The announcement caps a 15-year transition, said the commission.

PA Turnpike will begin removing toll plazas in the eastern sections in 2025. Open road tolling construction west of Reading is getting underway and the system will be fully operational there in early 2027, the commission said.

"The advent of open road tolling will advance safety and allow for the safe movement of vehicle traffic across our network,” said Michael Carroll, chairman of PA Turnpike and secretary of Pennsylvania DoT. 

“Pennsylvania is the great ‘American Getaway’ and open road tolling will get travelling members of the public to destinations across our great commonwealth in a safe an efficient manner.”

In an open road system, tolls are charged electronically as customers drive at highway speeds without slowing down or stopping beneath gantries located between interchanges. Equipment on the gantry and in the roadway processes E-ZPass or toll-by-plate transactions. Beyond properly mounting an E-ZPass transponder, customers will not need to do anything differently in preparation for the launch.

PA Turnpike also said that new access and increased convenience mean freight will move more efficiently and enable the expansion of economic development to more communities. The system also eliminates confusion and lane-switching associated with traditional, stop-and-go tolling.

Removal of toll booths removes obstacles and increases sight lines for customers reducing stress and distraction when entering and exiting the system. Also, removal of current toll booths and additional infrastructure at interchanges will see the return of green space along the system.

Non-stop travel also means lower emissions, less fuel use, and a cleaner environment. PA Turnpike’s transition to cashless tolling in 2020 resulted in a 45% systemwide reduction in CO₂ emissions. Open road tolling is anticipated to further reduce emissions by another 7% by 2030.

For more information on companies in this article

Related Content

  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • Multi-modal’s long road into the transportation mainstream
    June 4, 2015
    Andrew Bardin Williams looks at 20 years of multimodal transport in the Sun Belt and beyond and the key requirement for user engagement. Phoenix residents will head to the polls in August to decide whether to implement a three-tenths of a cent sales tax to fund the city’s new multimodal transportation plan. It will be the second transportation-related sales tax hike in the past 15 years yet city officials and advocates expect the resolution to easily pass—despite the strong anti-tax environment that has dom
  • Door opens on Toronto streetcar safety camera pilot
    February 18, 2025
    Canadian city's transit authority looks to deter dangerous motorists
  • Mersey Gateway tolling system launched
    March 1, 2017
    Tolling arrangements for the new Mersey Gateway in the UK have been announced. Both the new bridge and the Silver Jubilee Bridge will be tolled from autumn 2017. The Mersey Gateway is a new road bridge across the River Mersey and the Manchester Ship Canal in north-west England, which began construction in May 2014.