Skip to main content

Pennsylvania Turnpike to launch open road tolling in 2027

Customers will only need an E-ZPass transponder in preparation for the launch
By David Arminas August 13, 2024 Read time: 2 mins
PA Turnpike will begin removing toll plazas in the eastern sections in 2025 (image: Commonwealth Media Services)

The Pennsylvania Turnpike Commission will start converting its tolling system to open road tolling east of Reading city and on the Northeast Extension in January 2025

The announcement caps a 15-year transition, said the commission.

PA Turnpike will begin removing toll plazas in the eastern sections in 2025. Open road tolling construction west of Reading is getting underway and the system will be fully operational there in early 2027, the commission said.

"The advent of open road tolling will advance safety and allow for the safe movement of vehicle traffic across our network,” said Michael Carroll, chairman of PA Turnpike and secretary of Pennsylvania DoT. 

“Pennsylvania is the great ‘American Getaway’ and open road tolling will get travelling members of the public to destinations across our great commonwealth in a safe an efficient manner.”

In an open road system, tolls are charged electronically as customers drive at highway speeds without slowing down or stopping beneath gantries located between interchanges. Equipment on the gantry and in the roadway processes E-ZPass or toll-by-plate transactions. Beyond properly mounting an E-ZPass transponder, customers will not need to do anything differently in preparation for the launch.

PA Turnpike also said that new access and increased convenience mean freight will move more efficiently and enable the expansion of economic development to more communities. The system also eliminates confusion and lane-switching associated with traditional, stop-and-go tolling.

Removal of toll booths removes obstacles and increases sight lines for customers reducing stress and distraction when entering and exiting the system. Also, removal of current toll booths and additional infrastructure at interchanges will see the return of green space along the system.

Non-stop travel also means lower emissions, less fuel use, and a cleaner environment. PA Turnpike’s transition to cashless tolling in 2020 resulted in a 45% systemwide reduction in CO₂ emissions. Open road tolling is anticipated to further reduce emissions by another 7% by 2030.

For more information on companies in this article

Related Content

  • Details of new Dartford Crossing safety system unveiled
    January 21, 2015
    Since it launched on 30 November last year, Dart Charge has already helped to speed up journeys by removing the need to stop at a barrier to pay the Dartford Crossing charge. To get the most benefit from the changes, the UK Highways Agency has developed a new way of identifying and managing over-height vehicles and dangerous loads before they enter the tunnel, a job that until now was carried out at the payment barriers. All major tunnels have rules about what substances can be taken through them an
  • Underinvestment in infrastructure threatens economic growth
    January 24, 2012
    The 2011 Urban Mobility Report from the Texas Transportation Institute highlights the dangers of continued underinvestment in transportation infrastructure but also offers some hope in terms of possible solutions
  • Virginia launches E-Zpass Flex
    July 27, 2012
    Virginia Department of Transportation (VDoT) has launched of E-ZPass Flex, a new E-ZPass transponder able to switch between toll-free and toll-paying travel on the 495 Express Lanes scheduled to open by the end of this year. Because these lanes are an all-electronic tolling facility, every vehicle using them will need an E-ZPass transponder. And, though every standard E-ZPass transponder will work in the Express Lanes, only the E-ZPass Flex transponder enables drivers to use a manual switch on the transpond
  • Texas DOT reselects Atkins toll-plaza contract
    February 28, 2014
    The Texas Department of Transportation (TxDOT) has reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, US$10 million contract, Atkins will provide planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing services for TxDOT toll and managed-lane facilities throughout Texas. TxDOT currently operates more than 493 lan