Skip to main content

Open Roads collaborates with Virginia DOT on the 495 Express Lanes project

Opened on 17 November, the fourteen-mile corridor of new high occupancy toll (HOT) lanes in Northern Virginia from the Springfield Interchange to just north of the Dulles Toll Road on the Virginia side of the Capital Beltway provides drivers with a faster, more predictable trip on the Capital Beltway. The 495 Express Lanes project supported more than 16,000 jobs and generated nearly US$3.5 billion of economic impact state-wide. Intelligent Transportation Systems (ITS) provider Open Roads Consulting (Open R
December 11, 2012 Read time: 2 mins
Opened on 17 November, the fourteen-mile corridor of new high occupancy toll (HOT) lanes  in Northern Virginia from the Springfield Interchange to just north of the Dulles Toll Road on the Virginia side of the Capital Beltway provides drivers with a faster, more predictable trip on the Capital Beltway. The 495 Express Lanes project supported more than 16,000 jobs and generated nearly US$3.5 billion of economic impact state-wide.

Intelligent Transportation Systems (ITS) provider 5660 Open Roads Consulting (Open Roads) collaborated with the 1747 Virginia Department of Transportation (VDOT) and roads operator 600 Transurban to develop an interface that integrates the 495 Express Lanes Transportation Management System (TMS) and the Northern Virginia Public Safety and Transportation Operations Center (PSTOC) Advanced Transportation Management System.

The system, OpenTMS Enterprise System, was developed and deployed by Open Roads. The interface is designed to share different types of data between the two systems: incidents, work zones, DMS (dynamic message sign), traffic sensor, travel time, and weather station data.  Open Roads worked closely with VDOT and Transurban to define the system interface requirements, software functional requirements, current user interface to incorporate the HOT lanes information for use by the PSTOC management and staff. VDOT and Open Roads have made tremendous efforts to create situational awareness to deliver improved safety and travel times to the motoring public in the region.

Governor Bob McDonnell participated in an opening event celebration in Tysons Corner with elected officials, media and key project personnel to commemorate the opening of the new traffic solution. He commented that the opening of the 495 Express Lanes means opportunity for Virginia as the project not only helped create jobs during construction, but will continue to make Northern Virginia a more attractive place to work and live. He also stated that the Express Lanes will open the region for business by providing better access to key employer centers and delivering the infrastructure needed to grow businesses and create additional jobs.

For more information on companies in this article

Related Content

  • Schneider Electric aids New Hampshire DOT winter weather forecasts
    August 20, 2014
    Schneider Electric partnered with the New Hampshire Department of Transportation (NHDOT) during the 2013-2014 winter season as part of the Certified Public Manager (CPM) Program. The five-month partnership revealed precipitation forecasts from Schneider Electric to be more accurate in start and end times than a second weather/pavement forecasting service utilised by NHDOT. Schneider Electric created and customised a system to provide NHDOT with the most accurate precipitation forecasts, which are key to
  • Work begins on Auckland, New Zealand motorway project
    December 9, 2016
    Work has begun on new US$509 million (NZ$709.5 million) motorway in New Zealand, extending from Puhoi, approximately 50 km north of Auckland, to Warkworth, a distance of 18.5 kilometres. The project is New Zealand’s second Public Private Partnership (PPP) for a state highway and will be delivered by the Northern Express Group, which will finance, design, construct, manage and maintain the motorway for the 25 years that will follow the expected five year period to build the motorway. Full ownership of the
  • Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’
    May 1, 2015
    A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
  • Ground-breaking neutral V2X platform for C-ITS
    June 7, 2021
    Monotch's TLEX can be used by multiple stakeholders across C-ITS ecosystem