Skip to main content

Oklahoma Turnpike to go interoperable

Oklahoma Turnpike (OTA) is in discussion with Kansas Turnpike and North Texas Tollway (NTTA) on the viability of electronic interoperability between the three companies. It is close to agreement with North Texas Tollway and billing of each other’s customers should be in operation by the spring or summer of 2014. Discussions with the Kansas Turnpike are a little further behind and interoperability is likely to happen by the second half of 2014. Director of operations at the OTA, David Machamer, says much o
July 19, 2013 Read time: 2 mins
Oklahoma Turnpike (OTA) is in discussion with Kansas Turnpike and North Texas Tollway (2082 NTTA) on the viability of electronic interoperability between the three companies.  It is close to agreement with North Texas Tollway and billing of each other’s customers should be in operation by the spring or summer of 2014.  Discussions with the Kansas Turnpike are a little further behind and interoperability is likely to happen by the second half of 2014.

Director of operations at the OTA, David Machamer, says much of the work on the legal agreement and business rules for NTTA-OTA interoperability has been accomplished so they are close to going for formal board of directors approval.

There are few hardware issues. Both have E6 multiprotocol readers from 139 Transcore, as does Kansas Turnpike with its K-TAG brand.

The Oklahoma Turnpike system covers large proportion of the state's expressway standard highways, one a designated interstate but most important state routes.  Comprising ten tollroads some urban, others interurban the state turnpike system covers 605 centerline miles, about 1,000km. Toll collection is a mix of electronic toll, and cash toll lanes in an approximate 65/35 ratio.

NTTA is an entirely urban system with three major busy tollroads, two toll bridges and small toll tunnel.  It has no cash toll collection, 77 per cent being by electronic toll transponder and 23 per cent by video toll.

Machamer says interoperability with Kansas Turnpike to their immediate north should not be long after the NTTA arrangements go live.

For more information on companies in this article

Related Content

  • Developments in smarter multi-modal fare paynment
    February 2, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • TransCore to upgrade over 300 toll lanes in central Florida
    October 14, 2015
    The Central Florida Expressway Authority (CFX) has awarded TransCore a US$85 million project to design, install and maintain a new, innovative electronic toll collection system for over 300 toll lanes, as part of an ongoing initiative to improve its transportation management system. TransCore will upgrade the system with its Infinity Digital Lane System, which consists of independent modules that can be easily replaced, upgraded or removed in the field without affecting lane operations, reducing long-ter
  • Benefits of Florida's traffic signal retiming
    November 7, 2012
    Lee County in Florida has consolidated dramatic results of a major traffic signal retiming with installation of advanced monitoring and management technology for generating further benefits. The Lee County Department of Transportation (DOT), in the US State of Florida, has completed retiming of traffic signals for over 50 intersections in the cities of Fort Myers and Bonita Springs. The project aimed to evaluate existing operations and enable adjustments to optimise flows, and has produced dramatic results
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.