Skip to main content

Oklahoma Turnpike to go interoperable

Oklahoma Turnpike (OTA) is in discussion with Kansas Turnpike and North Texas Tollway (NTTA) on the viability of electronic interoperability between the three companies. It is close to agreement with North Texas Tollway and billing of each other’s customers should be in operation by the spring or summer of 2014. Discussions with the Kansas Turnpike are a little further behind and interoperability is likely to happen by the second half of 2014. Director of operations at the OTA, David Machamer, says much o
July 19, 2013 Read time: 2 mins
Oklahoma Turnpike (OTA) is in discussion with Kansas Turnpike and North Texas Tollway (2082 NTTA) on the viability of electronic interoperability between the three companies.  It is close to agreement with North Texas Tollway and billing of each other’s customers should be in operation by the spring or summer of 2014.  Discussions with the Kansas Turnpike are a little further behind and interoperability is likely to happen by the second half of 2014.

Director of operations at the OTA, David Machamer, says much of the work on the legal agreement and business rules for NTTA-OTA interoperability has been accomplished so they are close to going for formal board of directors approval.

There are few hardware issues. Both have E6 multiprotocol readers from 139 Transcore, as does Kansas Turnpike with its K-TAG brand.

The Oklahoma Turnpike system covers large proportion of the state's expressway standard highways, one a designated interstate but most important state routes.  Comprising ten tollroads some urban, others interurban the state turnpike system covers 605 centerline miles, about 1,000km. Toll collection is a mix of electronic toll, and cash toll lanes in an approximate 65/35 ratio.

NTTA is an entirely urban system with three major busy tollroads, two toll bridges and small toll tunnel.  It has no cash toll collection, 77 per cent being by electronic toll transponder and 23 per cent by video toll.

Machamer says interoperability with Kansas Turnpike to their immediate north should not be long after the NTTA arrangements go live.

For more information on companies in this article

Related Content

  • Pennsylvania Senate approves transportation budget
    November 22, 2013
    After lengthy discussions, the Pennsylvania Senate has approved a US$2.3 billion transportation funding bill to repair aging highways and bridges, and bolster mass transit across the state. The bulk of the money, US$1.65 billion, will go toward fixing bridges and roads; about US$475 million will go to mass transit systems, including metropolitan transportation authority Southeastern Pennsylvania Transportation Authority (SEPTA). The funding will be disbursed across all transportation modes, from gravel r
  • TEXpress adds reversible managed lanes
    April 19, 2017
    Land availability restrictions and tidal traffic flows have led to the implementation of a novel managed lane configuration in Texas, as Colin Sowman finds out. Dealing with traffic congestion related to the ‘tidal flows’ caused by large numbers of commuters making their way into major business hubs in the morning and returning to the suburbs in the evening, has seen the widespread use of adaptive signal timing and even reversible lanes.
  • Caltrans trials Xerox’s Passenger Detection System
    October 30, 2015
    Xerox’s Passenger Detection System has been trialled in California and compared with the state’s team of human counters giving some interesting results, as Colin Sowman discovers. Like others adopting high-occupancy and high-occupancy vehicle (HOV) lanes for congestion management, Caltrans has faced challenges with compliance in what has been effectively an ‘honour system’ with drivers trusted to set their tags correctly or comply with the multi-passenger requirement.
  • Kapsch TrafficCom to provide toll system for US express lanes project
    January 10, 2017
    Kapsch TrafficCom has been awarded a contract by I-77 Mobility Partners to provide the toll system and system integration for the Interstate 77 Express Lanes project in Charlotte, North Carolina. The contract includes the design, installation and ongoing maintenance of the project’s field-level systems and is one of the first toll facility construction projects in Charlotte, intended to use modern managed lanes to relieve traffic congestion and provide reliable travel times, while also offering drivers a