Skip to main content

Ohio Turnpike launches $250m modernised toll collection system

E-ZPass entry and exit gates have been removed at 20 toll plazas on 241-mile route
By Adam Hill April 12, 2024 Read time: 3 mins
Ohio Turnpike's new Westgate Toll Plaza (image: Ohio Turnpike and Infrastructure Commission)

The Ohio Turnpike and Infrastructure Commission’s new toll collection system has gone live on a 241-mile route comprising Interstate 80, I-90 and I-76.

The $250 million construction project, funded by toll revenue, is the largest in Ohio Turnpike's history and includes upgrades to electronic tolling in some places and new message signs for motorists.

The system now features a combination of open-road tolling lanes for E-ZPass customers and a gated exit system for non-E-ZPass customers who can pay by cash or credit card.

E-ZPass entry and exit gates have been removed at 20 toll plazas. In 2023, combined E-ZPass use on the network by car and truck customers was 74.1%, a rise of 0.7% from 2022.

Nine toll plazas no longer charge tolls, which means cash customers don't have to stop to get a ticket or pay a toll, and E-ZPass transponders will no longer be read. Overhead signs on the gantry now read: “NO TOLL, KEEP MOVING.”

This modernisation has been five years in the making; the first contract was approved in 2019. The first phase of the project, which permanently opened the entry gates in all E-ZPass toll booth lanes, was deployed at 20 interchanges from Toll Plaza 52 (Toledo Airport-Swanton) in Lucas County to Toll Plaza 209 (Warren) in Trumbull County. The exit gates in all dedicated E-ZPass lanes were opened.

At these interchanges, 127 lanes were upgraded with new electronic tolling components, including sensors and other equipment to read E-ZPass transponders, and to classify vehicles by the number of axles and vehicle height.

Automated toll payment machines, which accept cash and credit cards, were installed at all 20 toll plaza interchanges as well as the four mainline toll plazas.

Two new plazas, Swanton Toll Plaza (milepost 49) in Lucas County and Newton Falls Toll Plaza (milepost 211) in Trumbull County, have opened, forming the new ends of the ticketed toll system.

E-ZPass customers can travel non-stop at highway speeds on the dedicated open-road tolling lanes in both directions.

“The modernisation of the toll collection system has been a long, challenging and complex project," said Ohio Turnpike executive director Ferzan Ahmed. 

“The launch of the new toll collection system, which includes open-road tolling, the removal of all gates in E-ZPass entrance and exit lanes, and enhancements to our customer service centre, and more, are significant milestones."

Ahmed emphasised the economic benefits of modernisation. "The local, regional and national economic benefits of our top-performing facility will be immense for our commuters, travellers, as well as the commercial freight industry," he said.

“In the coming weeks and months, we will continue to monitor the performance of the new system, and close out various projects as they are completed.”

For more information on companies in this article

Related Content

  • IBTTA applauds new interstate study
    September 13, 2013
    A new study, Interstate 2.0: Modernising the Interstate Highway System via Toll Finance, by US public policy think tank, the Reason Foundation, details how much it will cost to reconstruct and widen Interstate highways in all 50 states and shows how to pay for the modernisation efforts with toll revenues. It makes the case for lifting the federal prohibition on tolling existing lanes of the Interstate highway system and states: “…as the reality of the cost of Interstate reconstruction and modernisation s
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • Emovis expands e-tolling in Puerto Rico
    July 11, 2024
    Contract with Metropistas builds on work which started in US territory in 2015