Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • EU releases funds to improve European transport connections
    September 12, 2014
    The European Commission has released US$15.3 billion of EU funding to improve European transport connections and invited Member States to propose suitable projects to use the funding. Proposals must be submitted by 26 February 2015. EU financing for transport has tripled to US$33.6 billion for the period 2014-2020, compared to US$10.3 billion for 2007-2013, under the new Connecting Europe Facility (CEF). This is the first tranche of the new funding for transport to be made available. The funding will
  • EU identifies priorities for trans-European transport network until 2030
    January 20, 2015
    The European Commission has published nine studies on the state of play and the development needs of the Ten-T core network corridors. The studies have identified infrastructure development needs which represent approximately US$811 billion of financial investment until 2030. They highlight the importance of optimising the use of infrastructure along the corridors, notably through intelligent transport systems, efficient management and the promotion of future-oriented clean transport solutions. This is the
  • European fast charger project launched
    December 18, 2014
    The launch of the European Ten-T European Long-Distance Electric Clean Transport Road Infrastructure Corridor (Electric) which is co-funded by the EU and supports the installation of a corridor of high-quality fast chargers along key European motorways until the end of 2015, aims to accelerate electric vehicle uptake in the involved member states. Its focus is on interoperability, sustainable infrastructure setup and network planning and infrastructure deployment. The aim of the project is be to create a
  • Robust enforcement strategy needed for free flow toll roads
    January 10, 2012
    Timidity has no place in effective enforcement operations on free-flow toll roads, says the NRA's Cathal Masteron. What's needed is a robust strategy which starts big and reduces in size over time, rather than starts small and gains a reputation for being easy to avoid