Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • Motown morphs into Mobility City
    August 7, 2018
    Detroit was once a byword for urban decay – but ITS America recently held its annual meeting there. This gave David Arminas a chance to assess how fast Motor City is moving down the road to recovery. Motor City, as Detroit is still called, was on its financial knees only five short years ago. The future looked bleak as the city and greater urban area bled jobs and population. It was on 18 July 2013 that Motown, as Detroit is also known, filed for Chapter 9 bankruptcy protection, the
  • IBTTA: tolling embraces future of mobility
    August 15, 2019
    The future of mobility is a complex and changing topic. The IBTTA’s Bill Cramer finds the tolling industry is asking new questions – and finding some surprising new answers
  • Moveble barriers improve workzone safety, reduce costs
    January 25, 2012
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the