Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges
    May 14, 2015
    Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As
  • Washington I-90 tolling could start in 2015
    January 2, 2013
    A planned Washington Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable. Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of toll
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • FHWA formula aims to bridge funding gap
    January 20, 2022
    IBTTA welcomes FHWA's $26.5bn for bridges - and announces its executive officers for 2022