Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • Tolling cameras being installed on Ohio rivers project
    August 8, 2016
    Tolling won’t begin until late this year, but drivers may soon notice cameras in place on the toll gantry located at the north end of the Abraham Lincoln Bridge, near Court Avenue, on the Ohio Rivers Project in the US. Two cameras are scheduled to be installed for testing as part of preparations for the new RiverLink all-electronic tolling system. Tolling won’t begin until cross-river capacity is added to the system. That means either the improved Kennedy Bridge will be fully open to six lanes of I-65
  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • IBTTA Toll Excellence Awards, new officers announced
    September 15, 2016
    Transportation leaders gathered for IBTTA's 84th Annual Meeting and Exhibition in Denver, Colorado, this week