Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • Interoperability: towards the new frontier
    October 22, 2018
    After six years of intensive research, testing and negotiation, the US tolling industry is well on its way to groundbreaking results in the effort to establish regional - and eventually national - toll interoperability, says IBTTA’s Bill Cramer. Interoperability has been a high priority on the US tolling industry’s agenda for more than a decade. But several factors made it a uniquely complex issue to resolve - including the number of agencies involved, the significant investments those agencies had already
  • Emovis’ 5-step guide to educating drivers on road usage charging
    October 31, 2023
    If people don’t understand the benefits of road usage charging, then it is unlikely to have public support. Scott Jacobs of Emovis outlines ways in which key messages – particularly on fairness - can be put across
  • Toll performance exceeds expectations, improves travel times
    January 30, 2012
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • US ITS systems approach critical decision time
    February 6, 2012
    Connie Sorrell, chair of the ITS America Annual Meeting and Exposition, explains why ITS in America is approaching a critical crossroads