Skip to main content

Ohio Turnpike infrastructure project funds

The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike. The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.
September 17, 2013 Read time: 2 mins
The Ohio Turnpike and Infrastructure Commission (OTIC) has approved the US$930 million funding needed for ten projects in northern Ohio, each within twenty miles of the turnpike.

The 241 mile-long, limited-access toll highway serves as a primary corridor to Chicago and Pittsburgh.

The projects were among ten that received funding in the turnpike’s first venture into financing projects using funds from toll charges.  Of the projects receiving funding, US$340 million was allocated towards construction of the eastbound bridge on the inner belt. The westbound bridge is under construction and expected to open to traffic this fall. It will carry traffic in both directions until the second bridge is completed in the fall of 2016. US$39 million was allotted to the Opportunity Corridor to help pay for the first leg of a US$334 million project to widen a one-mile stretch of East 105th Street from Chester Avenue to Quincy Avenue.

The corridor and bridge projects were among 12 for which the Ohio Department of Transportation sought funding. The commission rejected two as not meeting the basic criteria for securing turnpike money, which include the distance between the projects and the turnpike and the project’s impact on turnpike traffic density and toll revenue.

“This is a true partnership between our agencies. No trips start or end on the Turnpike, so our financial support of these projects is a benefit to the entire transportation system and Turnpike customers as well,” stated Rick Hodges, OTIC Executive Director.

Related Content

  • Parsons Brinckerhoff JV to design Queensland motorway project
    February 11, 2014
    Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland. The project, worth in excess of US$50m, was awarded by the Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergenc
  • Most EV charging ‘takes place at home’
    July 30, 2015
    New analysis by plug-in vehicle campaign Go Ultra Low suggests that British motorists could no longer have to rely on the conventional petrol station. More than 90 per cent of electric vehicle (EV) charging takes place at home while total charging volumes have almost tripled since 2014, according to new usage data from leading infrastructure provider Chargemaster. Coupled with bumper uptake of plug-in vehicles – more than 14,500 were registered in the first half of 2015 – the new findings point to the po
  • Belarus toll system expanded
    August 7, 2014
    The BelToll electronic toll collection system, implemented and operated by Kapsch TrafficCom in Belarus, Serbia, was expanded by another 256 kilometres at the beginning of August, just one year after its commissioning in 2013. The system, which was also expanded by 815 kilometres in January 2014, is now 1,189 kilometres long; according to Kapsch TraffiCom, the number of registered vehicles has more than trebled since the system was put into operation, increasing from 60,000 to 190,000 vehicles.
  • HDR predicts an adaptable and flexible future for roadways
    December 19, 2016
    HDR consultants, Brian Swindell and Bernie Arseanea, consider managed lanes’ untapped potential. It is no surprise that corridor planning continues to challenge agencies and owners as demand continues to surpass roadway capacity.