Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

For more information on companies in this article

Related Content

  • USDOT outlines steps for managing Highway Trust Fund shortfall
    July 2, 2014
    US Secretary of Transportation Anthony Foxx has written to state transportation departments and transit agencies outlining steps the Department of Transportation (DOT) will soon be forced to take to manage the impending insolvency of the Highway Trust Fund. In both letters, Secretary Foxx outlined the Department’s proposed plan while emphasising the need for Congress to act in order to avoid such a shortfall. “There is still time for Congress to act on a long term solution,” said Secretary Foxx. “Our tr
  • Widest bridge in the world Port Mann open in Vancouver
    April 25, 2013
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.
  • Progress in talks on new Sydney toll road
    October 10, 2013
    Toll roads operator Transurban says it has made good progress in its talks with the New South Wales government on a US$2.5 billion tunnel proposal for Sydney's north. The proposed project would be a tolled motorway linking the M1 Pacific Motorway, formerly the F3 freeway, at Wahroonga to the M2 toll road at West Pennant Hills. The project involves the construction of new eight kilometre tunnel, which would be the longest tunnel of its kind in Australia. “We have made significant progress in our disc
  • The Canadian way
    July 16, 2012
    Delcan has developed an ITS project evaluation methodology for Transport Canada. Victor Bruzon explains how it will assist in selecting and managing programmes. ITS projects offer a cost-effective solution for many transportation problems. Individual projects are often not evaluated and such evaluations can be restricted by limited data, the ability of ITS to affect only a portion of the transport network, and by evaluation methodologies that were developed with more traditional transport investments in min