Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

For more information on companies in this article

Related Content

  • US DOT announces grants to support high-tech low-no buses, American manufacturing
    September 18, 2017
    The US Department of Transportation’s Federal Transit Administration (FTA) has announced US$55 million in grant selections through the Low or No Emission (Low-No) Vehicle program, which funds the development of transit buses and infrastructure that use advanced fuel technologies. Fifty-one projects in 39 states will receive a share of the funding, including the City of Lubbock, Texas and local transit agency Citibus, the Jacksonville Transportation Authority (JTA) in Florida and the Alaska Department of
  • Michigan improves real time traffic information
    June 24, 2013
    Michigan’s Road Commission for Oakland County (RCOC) has revamped its online real-time traffic map, making the congestion-monitoring tool simpler, easier and faster to use. The changes allow users to see congestion levels on county roads across Oakland County, thanks to data provided by RCOC’s Faster and Safer Travel through Traffic Routing and Advanced Controls (Fast-Trac) adaptive traffic-signal system. Fast-Trac detects the volume of traffic moving in each direction at equipped intersections and uses th
  • PennDOT 511 traveller information system to be privatised
    January 11, 2013
    The Pennsylvania Department of Transport (PennDOT) 511 system, 511PA, and the Pennsylvania Turnpike’s Roadway Information Program (TRIP), are to be privatised, following approval by the Pennsylvania Public Private Transportation Partnership (P3) Board of a project soliciting private sector proposals to manage and operate the systems. In operation since 2009, 511PA provides traffic-delay warnings, weather forecasts, average traffic speeds on urban interstates and access to more than 670 traffic cameras. The
  • US closer to finalising a new reauthorisation bill
    January 25, 2012
    Pete Goldin talks with ITS America about the continuing efforts of US Congress to finalise a transportation reauthorisation bill and how this will impact the ITS industry