Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

For more information on companies in this article

Related Content

  • Sanral gets US$770 million for freeway project
    June 21, 2012
    South African National Roads Agency (Sanral) has received a bailout of over US$770 million from the government for its Gauteng Freeway Improvement Project (GFIP). The cash injection is a bailout for the electronic toll system which cost an estimated US$2.66 billion, much of it which still has to be paid for. The cash injection will enable tolls to pay for over 25 per cent of the cost of the project and enable the planned toll charges, due to be introduced on highways on 30 April, 2012 to be reduced by 25 pe
  • US DOT announces funding for Ohio BRT project
    June 3, 2016
    The US Department of Transportation’s Federal Transit Administration (FTA) has awarded US$37.5 million in federal grant funds to the Central Ohio Transit Authority (COTA) for a new Bus Rapid Transit (BRT) service in Columbus. The new line, CMAX, will help relieve passenger crowding and spur economic development along Cleveland Avenue, one of the city’s busiest travel corridors The 15.6-mile BRT service will provide a much-needed option in a corridor with high transit use. CMAX will help reduce passenger
  • Predicting and solving future transport problems?
    August 10, 2012
    Can the future be predicted? With what accuracy can ‘predictive analytics’ be used to help anticipate demand? This is a relatively new science for transportation and over the next few years it will be interesting to see to what extent it can solve some common problems. Transportation authorities may be close to finding the golden chalice that is accurate prediction of how traffic will behave as congestion occurs. Predictive algorithms are not necessarily new, but the coming together of conditions needed for
  • Tolling is still stuck on the sidelines says ASECAP speaker
    August 19, 2015
    Geoff Hadwick attended ASECAP’s 2015 Study Days meeting in Lisbon and found a frustrated European tolling sector undertaking some soul searching. The international road tolling industry its failing to make it case and the sector is losing out to a range of other socio-political lobby groups according to International Bridge, Tunnel and Turnpike Association (IBTTA) chief executive Pat Jones. Speaking at the recent 2015 ASECAP Study Days conference in Lisbon, Jones issued a stark warning: “Tolling is still o