Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

Related Content

  • November 8, 2024
    Kapsch TrafficCom picks up 10-year SoCal toll extension
    Express Lanes work in Greater Los Angeles will now continue until 2041
  • October 27, 2016
    Iteris to plan and design Orange County’s ICM project
    Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
  • August 19, 2014
    Iteris’ gets Orange County in sync
    David Crawford welcomes progress in cross-boundary coordination Iteris’ US$1.4 million contract for traffic signal synchronisation on Newport Boulevard, California is evidence of an acceleration of activity by the Orange County Transportation Authority (OCTA) in coordinated traffic management. It also continues the US traffic management specialist’s established technical relationship with the area’s prime transportation agency.
  • February 8, 2017
    Michael Baker International to study traffic congestion in Los Angeles
    Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway