Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

For more information on companies in this article

Related Content

  • Tags or communication based toll payment systems?
    January 20, 2012
    Midland Expressway Ltd's Tom Fanning discusses deployment of Near Field Communicationbased payment on the M6 Toll facility The M6 Toll's introduction from early next year of Near Field Communication (NFC) is a pragmatic response to the relative scarcity of tolled facilities and the concomitant low levels of tag take-up in the UK, according to the road's operator, Midland Expressway Ltd (MEL). Nevertheless, Dedicated Short-Range Communication (DSRC)-based tags operating at 5.8GHz are still a key part of the
  • Four finalists for Detroit's Sustainable Cities Challenge
    June 25, 2025
    Ideas seek to improve efficiency of freight operations in Eastern Market area
  • Signal optimisation reduces congestion, improves travel times
    February 2, 2012
    The Metropolitan Government of Nashville and Davidson County's Department of Public Works(MPW) identified seven corridors in the County that experience heavy traffic congestion and needed traffic signal timing improvements to improve traffic flow as well as air quality and fuel consumption. The seven corridors included a total of 223 signalised intersections. To conduct this study, termed the Traffic Signal Optimisation Study for the Metro Nashville Signal System, MPW received funding from the Federal Conge
  • Colombia seeks expressions of interest for Bogotá LRT
    December 15, 2014
    Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p