Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

Related Content

  • September 27, 2012
    Pay-as-you-go freeway toll scheme unveiled in Taiwan
    A new freeway toll scheme plan has been unveiled by the Transportation and Communication Minister Mao Chi-kuo in Taiwan. All drivers are required to pay toll under the pay-as-you-go scheme. According to the minister, an average of between US$0.51 and US$0.68 will be paid by the drivers daily. Planned to be launched in 2013, the charges will be based on travel distance. A ladder-type pricing measure will be proposed by the ministry to show the maximum and minimum toll fees based on the travelled distance. Me
  • June 17, 2016
    Brooklyn eyes Bogota’s BRT system
    David Crawford considers the increased interest in bus rapid transit and looks that the latest trends. Bus rapid transit (BRT) is gaining an increasingly high profile in the US public transport agenda, for two main reasons. One is the potential for ‘trains on wheels’ to save substantially on installation costs as compared with other modes such as underground metros or light-rail transit. Another, highlighted in the case of New York City, is the value of having a rapid surface-based alternative available whe
  • April 11, 2017
    JV wins multi-billion dollar West Gate Tunnel project
    CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
  • July 7, 2015
    JMT/Parsons Brinckerhoff JV to consult on Maryland bridge replacement
    The Maryland Transportation Authority (MDTA) has selected a joint venture of Johnson, Mirmiran and Thompson (JMT) and Parsons Brinckerhoff as general engineering consultant for the replacement of the Harry W. Nice Memorial Bridge. The bridge, also known as the Potomac River Bridge, is a 1.7-mile (2.7 km), two-lane continuous truss bridge on US 301 that spans the Potomac River between Newburg in Maryland and Dahlgren in Virginia. The US$1 billion programmed budget involves replacing the existing structure