Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

Related Content

  • November 9, 2012
    US ushers in reforms with new transportation bill
    On behalf of ITS America, Paul Feenstra maps out implications and opportunities for the ITS industry. A critical milestone was reached last month when the US Congress passed, and President Obama signed, legislation reauthorising the nation’s surface transportation programmes, breaking a nearly three-year log-jam which had stymied critical transportation reforms and delayed much-needed infrastructure projects. The law, numbered P.L. 112-141 but known as MAP-21 (Moving Ahead for Progress in the 21st Century),
  • August 12, 2015
    Figures show Express Lanes bring wider benefits
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • August 7, 2020
    Caltrans reflects latest safety policy
    After recent studies, California DoT is reviewing its highway design standards
  • November 12, 2013
    Fitch Ratings analysis indicates problems for toll express lanes
    A special report, US Managed Lanes, by Fitch Ratings sees toll express or managed lanes (MLs) as especially difficult to assess for financial viability, saying that they vary enormously one to another and are likely to demonstrate very different performance and be subject to greater volatility than regular toll roads. But they say there is now sufficient experience with managed lanes (MLs) for some lessons to be learned. ML time savings compared to the regular lanes has been seen as the fundamental drive