Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

Related Content

  • January 10, 2014
    Will interoperability prevent progress?
    David Crawford examines the political and industrial background to the tolling technology debate. Saving the US State of California ‘millions of dollars’ in tolling infrastructure costs by encouraging new technologies is the professed aim of a legislative Bill, SB 242, which is currently moving through the State’s Senate (upper house) process. According to its sponsor, Republican State Senator Mark Wyland, permitting alternatives to the current FasTrak-branded radio-frequency identification (RFID)-based sys
  • February 4, 2025
    Utah Department of Transportation: How we’re using traffic analytics software
    Our use of Iteris ClearGuide lets our traffic operations engineers interpret critical probe traffic data without the need for statisticians and software developers
  • May 12, 2014
    New research finds distracted driving on the rise on I-95
    Transurban-Fluor and AAA Mid-Atlantic have released the second annual report on distracted drivers on I-95 in Northern Virginia, which found that despite major construction, distracted driving is a growing problem on the heavily travelled corridor. The report, part of the Orange Cones, No Phones campaign focused on reducing distracted driving in the 95 Express Lanes construction zone, found that the number of frequent I-95 drivers likely to use their cell phone while driving has increased from 56 percent i
  • January 6, 2016
    Test 7th January 2016 News 1
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam