Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

Related Content

  • March 3, 2016
    Consortium selected for Maryland LRT project
    The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
  • June 26, 2018
    Fasten your seatbelts: it’s going to be a bumpy ride
    A spat has broken out between two major US transportation organisations over how best to pay for road use: the ATA says tolls are ‘fake funding’ while IBTTA has scorned ‘scare tactics and falsehoods’… Much has been made of the state of US roads: everyone agrees that funding is needed – but who should pay? And how? Chris Spear, president and CEO of American Trucking Associationsm(ATA), believes finance is facing a cliff edge: the Highway Trust Fund (HTF), historically the primary source of federal revenue
  • May 4, 2022
    Universal basic mobility hits LA
    LADoT launches $17.8m pilot scheme designed to increase access to transportation
  • May 11, 2017
    Pricing practise for HOT lane operation
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure