Skip to main content

OCTA seeks proposals from three teams for I-405 freeway project

The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
March 31, 2016 Read time: 2 mins
The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line.

The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final request for proposals.

The US$1.7 billion project is intended to improve commute times on the San Diego Freeway (I-405) from the SR-73 to the I-605, an area travelled by more than 370,000 vehicles a day, making it the busiest stretch of highway in the nation.

The project, set to begin construction in 2017, includes adding one regular general-purpose lane in each direction, as promised in Measure M, and building express toll lanes.

The design-build firms shortlisted because of their qualifications for the project are OC 405 Partners, Shimmick-Tutor Perini and 7136 Skanska-Flatiron.

Once received, OCTA staff will evaluate the proposals to determine which one offers the best value to OCTA in terms of price and technical merit. The OCTA board is scheduled to approve the selection of the design-build team in November.

The Measure M project, being constructed in cooperation with 3879 Caltrans, will be funded by a combination of local, state and federal funds, with the toll lane portion of the project financed and paid for by those who choose to pay a toll and use the 405 Express Lanes.

The project is expected to be completed in 2022.

For more information on companies in this article

Related Content

  • TEXpress adds reversible managed lanes
    April 19, 2017
    Land availability restrictions and tidal traffic flows have led to the implementation of a novel managed lane configuration in Texas, as Colin Sowman finds out. Dealing with traffic congestion related to the ‘tidal flows’ caused by large numbers of commuters making their way into major business hubs in the morning and returning to the suburbs in the evening, has seen the widespread use of adaptive signal timing and even reversible lanes.
  • Toll roads important to Trump’s infrastructure plan
    January 10, 2017
    According to The Hill, US toll roads may surge under a US$1 trillion infrastructure proposal being floated by Donald Trump. The president elect’s idea for rebuilding the nation’s roads and bridges relies on private companies instead of the federal government to back transportation projects. Experts believe this means investors will be attracted to projects that can recoup their investment costs using some sort of revenue stream, such as through tolls or user fees. “If he moves forward with an infrastr
  • Fluor consortium named preferred bidder for Netherlands motorway project
    July 1, 2016
    Dutch engineering company Fluor Corporation is part of the 3Angle consortium, a special purpose company selected as the preferred bidder by the Directorate-General for Public Works and Water Management of the Netherlands (Rijkswaterstaat) for the A27/A1 public private partnership (PPP) project in the Netherlands. The 3Angle consortium, comprised of Fluor, Heijmans Capital and 3i Infrastructure, will carry out the design, build, management, maintenance and financing of existing and new infrastructure of t
  • Archer air taxis proposed for New York City
    April 18, 2025
    Big Apple joins Bay Area and LA as suggested sites for US air taxi networks