Skip to main content

Norway’s central tolling system contract extended

The Norwegian Public Road Administration has extended its contract with Q-Free to operate the country’s central tolling system. The contract was due to expire in November 2014, but has been extended for a minimum of 7.5 months. The extension has a minimum value of approximately US$5.6 million. The CSNorway contract was initially signed in 2007 and included the development of the system and conversion of all existing systems into one common central system. Around forty different concessions are running on th
July 18, 2013 Read time: 1 min
The Norwegian Public Road Administration has extended its contract with 108 Q-Free to operate the country’s central tolling system. The contract was due to expire in November 2014, but has been extended for a minimum of 7.5 months. The extension has a minimum value of approximately US$5.6 million.

The CSNorway contract was initially signed in 2007 and included the development of the system and conversion of all existing systems into one common central system. Around forty different concessions are running on the system, which has been running without problem since the start and has had frequent updates to provide a flexible solution for all concessions, from small ones with 500 vehicles per day to those with over 160,000 vehicles per day. In 2012, over 461 million crossings were processed, totalling over US$900 million in tolling revenues for the Norwegian Public Roads Administration.

Related Content

  • August 12, 2015
    Satellite-based truck tolling provides Slovak solution
    Slovakia opted for a satellite-based tolling system and following last year’s enlargement it now has the European Union’s largest truck user charging system.
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • March 7, 2023
    Swarco sets up live-lane running on Germany's A8
    System spans 2.8km along hard shoulder of motorway between Karlsruhe and Karlsbad
  • November 2, 2015
    Q-Free wins autopass contract in Norway
    Q-Free has been awarded a contract, valued at US$3 million by the Norwegian Public Roads Administration (NPRA) for autopass equipment for the Bypakke Grenland toll project, including installation and service and maintenance for 90 months, with further options for the service and maintenance period. The installation is due to be completed in the third quarter of 2016.