Skip to main content

New York tolls for Kapsch

New tolling system covers four bridges and two tunnels between the city and New Jersey
By Adam Hill December 22, 2022 Read time: 2 mins
George Washington Bridge, New York City (© Songquan Deng | Dreamstime.com)

Kapsch TrafficCom USA has completed delivery of a new tolling system covering four bridges and two tunnels between New York and New Jersey.

The cashless system means drivers are no longer required to stop at toll booths. For E-ZPass users, nothing will change. Those without an E-ZPass will have their licence plates automatically recorded and receive bills via mail.

The final step of the project, for which the Port Authority of New York and New Jersey and Kapsch TrafficCom were awarded ITS NY Project of the Year 2022, went live this month.

“With the system for the Lincoln Tunnel going live, we have concluded six years of tireless work to enable cashless tolling for drivers crossing between New York and New Jersey,” says JB Kendrick, president Kapsch TrafficCom USA.

Port Authority executive director Rick Cotton adds: “This upgrade is a win-win for all drivers who use our crossings by cutting precious minutes from daily commutes, by reducing vehicle accidents in toll lanes, and by decreasing emissions from vehicles waiting in line to pay cash at toll booths.”

The project included the replacement of the legacy toll collection system at all Hudson River and Staten Island Bridge crossings operated by the Port Authority with AET technology provided by Kapsch.

The tolling system covers four bridges, two tunnels, 13 zones, two-way traffic with one direction tolled at reversable lanes and three plazas.

Kapsch installed new tolling sensors and equipment providing proprietary stereoscopic nVDC technology in order to create all electronic transactions.

In addition to the six crossings, the system also includes Central Host functionality with primary and secondary host server installations.

The system is maintained 24/7 by Kapsch personnel. 

For more information on companies in this article

Related Content

  • Sanef wins Mersey Gateway Bridge Free Flow toll system
    April 28, 2014
    Sanef Group has announced the financial close of the Mersey Gateway project in the UK, after Halton Borough Council signed agreements with the Merseylink consortium for the construction and the maintenance of the new bridge and its associated toll system, as well as for the toll operation and demand management.
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • OmniAir publishes new certification programme for C-V2X RSUs
    July 18, 2023
    It can be used in procurement processes by US state DoTs and infrastructure owner-operators