Skip to main content

New York State Thruway to go all electronic

The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic. Although the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic. Work is now starting on the new bridge which under the contract
February 21, 2013 Read time: 2 mins
The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic.

Although  the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic.

Work is now starting on the new bridge which under the contract is due for completion by April 2018. The new bridge will be located immediately north of the existing bridge and the first traffic to be moved from the old bridge will be the non-toll northbound traffic. The old toll plaza will probably stay in service for at least the first half of construction. The new AET system seems likely to be needed some time in 2015 or 2016.

The move to AET will reduce the capital costs of the new bridge project which includes the new Tappan Zee toll plaza. The ORT plus cash toll plaza as originally planned would have cost an estimated US$61 million. AET with gantries over four or five lanes is mush less - of the order of US$10 million to US$15 million in capital and setup costs.  AET also has clear advantages over ORT in safety (less driver distraction, no diverge/merge movements, fewer speed changes) and in environmental impacts (less idling and acceleration to generate tailpipe emissions, smaller paved footprint.)

Related Content

  • VW scandal prompts emissions testing debate
    December 1, 2015
    In the wake of the VW scandal John Kendall looks at emissions testing on both sides of the Atlantic. Since the VW emissions story broke in September, emissions testing has come under greater scrutiny, and none more so than in Europe, where critics have long been highlighting the weaknesses of the testing system. Ironically, changes to the emissions testing process were already under review but the story has pushed it up the agenda.
  • Cybercrime is not a remote threat for toll operations
    February 8, 2017
    The rise of cybercrime is starting to impact tolling concessions, as Colin Sowman discovers. Yahoo’s revelation that it has taken two years to discover that it had suffered a security breach resulting in hackers stealing the details of 500 million users is shocking - although the hackers only gained access to users’ names, contact details and encrypted passwords.
  • FHWA proposes new performance measures to reduce highway congestion
    April 19, 2016
    The US Department of Transportation’s Federal Highway Administration (FHWA) today released a proposed regulation outlining new performance measures to assess travel reliability, congestion, and emissions at a national level. It calls for an increased level of transparency and accountability in establishing and achieving targets for performance impacting commuters and truck drivers. The measures address the concerns outlined in the USDOT report Beyond Traffic, which examines the trends and choices facing
  • Freight poses growing problem for city authorities
    March 3, 2017
    Wes Guckert considers possible solutions and countermeasures to the problems of increased freight deliveries in growing cities. In January 2016, the US Department of Transportation (USDoT) conducted a session on the SmartCity Challenge and Urban Freight and Logistics. This session was a follow-up to the USDoT report titled, Beyond Traffic 2045.