Skip to main content

New York State Thruway to go all electronic

The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic. Although the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic. Work is now starting on the new bridge which under the contract
February 21, 2013 Read time: 2 mins
The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic.

Although  the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic.

Work is now starting on the new bridge which under the contract is due for completion by April 2018. The new bridge will be located immediately north of the existing bridge and the first traffic to be moved from the old bridge will be the non-toll northbound traffic. The old toll plaza will probably stay in service for at least the first half of construction. The new AET system seems likely to be needed some time in 2015 or 2016.

The move to AET will reduce the capital costs of the new bridge project which includes the new Tappan Zee toll plaza. The ORT plus cash toll plaza as originally planned would have cost an estimated US$61 million. AET with gantries over four or five lanes is mush less - of the order of US$10 million to US$15 million in capital and setup costs.  AET also has clear advantages over ORT in safety (less driver distraction, no diverge/merge movements, fewer speed changes) and in environmental impacts (less idling and acceleration to generate tailpipe emissions, smaller paved footprint.)

Related Content

  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • Deaths of US pedestrians rise sharply, says GHSA report
    April 2, 2019
    Pedestrian deaths across the US have risen to their highest number in nearly 30 years. Many factors are responsible - including the rise and rise of SUVs - according to a worrying new GHSA report ore pedestrians died on US roads last year than in any year since 1990. The Governors Highway Safety Association (GHSA) suggests that 6,227 pedestrians were killed in 2018 – a 4% increase on 2017. Pedestrian deaths as a percentage of total motor vehicle crash deaths increased from 12% in 2008 to 16% in 2017, whi
  • Just Zip it! Lindsay takes to the road
    October 10, 2018
    Greater vehicle connectivity is going to have huge implications for traffic management. David Arminas climbed aboard a Lindsay Road Zipper to see what this might mean in future As vice president of barrier specialist QMB Canada, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost
  • Governments must look beyond short-term spending of public funds
    February 2, 2012
    Phil Pettitt, Chief Executive of innovITS, the UK's ITS Centre of Excellence, argues that governments need to look beyond the short-term when looking to pump-prime economic recovery with public funds. It seems, in the current economic climate, that a 'good' day is one in which no company is announcing job cuts or going into administration. Consumer demand is down and businesses are retrenching, cutting costs and fretting over the consequences of shrinking opportunities and order books. It has not been this