Skip to main content

NCDOT chooses PPP to improve I-77 traffic flow in Charlotte

North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En
April 17, 2014 Read time: 2 mins
4775 North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions.
 
Following a required bidding process and pending final review 5428 Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. English and the lead design firm of 4736 Louis Berger Group.

The US$655 million project aims to improve traffic flow on a 26-mile stretch of one of the most congested highways in North Carolina, and will be the first public-private partnership (P3) contracted by NCDOT.

“Louis Berger is proud to be the lead designer for NCDOT’s first P3 endeavour,” said Mike Kirk, vice president for Louis Berger’s design-build practice. “The I-77 high-occupancy managed lanes will provide a cost-efficient solution that will improve travel time reliability along this important corridor.”

Construction is anticipated to begin as early as December of this year, with an expected completion date in mid-2018.

For more information on companies in this article

Related Content

  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.
  • Real time active traffic management improves travel times
    July 17, 2012
    Traffic management centres (TMC) have traditionally served to provide surveillance and responses to traffic incidents and recurring and non-recurring changes in road networks. Typically, a TMC collected field data from the roadway and transit infrastructure and provided the integration necessary for operators to see what was happening and then coordinate a response. Standard operating procedures (SOPs) guided operators on how to respond to a given situation. It eventually became impractical for TMC operat
  • Caltrans to focus on traffic management in 2014
    February 21, 2014
    Although San Diego County may see a downturn new freeway infrastructure projects during 2014, many projects, from rail to highways and cycle paths, are still in the pipeline for 2014, according to the region's transportation planning agencies. Laurie Berman, district director for the regional office of the California Department of Transportation, said last week that Caltrans' focus is transitioning from general purpose lane expansions to more traffic management. The new direction is meant to provide trav
  • Managed lanes – the riddle wrapped up in an enigma
    December 15, 2014
    Managed lanes have something of a patchy track record and can pose authorities problems as well as solutions. Many authorities in the US and beyond have converted, or are converting, parts of the highway network into ‘Managed Lanes’ and charging motorists a fee to avoid the delays on the adjoining free use lanes. Some authorities have converted underused High Occupancy Vehicle (HOV) lanes into priced-managed high occupancy/toll lanes (HOT lanes) whereby the price charged can vary depending on a number of fa