Skip to main content

NCDOT chooses PPP to improve I-77 traffic flow in Charlotte

North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En
April 17, 2014 Read time: 2 mins
4775 North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions.
 
Following a required bidding process and pending final review 5428 Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. English and the lead design firm of 4736 Louis Berger Group.

The US$655 million project aims to improve traffic flow on a 26-mile stretch of one of the most congested highways in North Carolina, and will be the first public-private partnership (P3) contracted by NCDOT.

“Louis Berger is proud to be the lead designer for NCDOT’s first P3 endeavour,” said Mike Kirk, vice president for Louis Berger’s design-build practice. “The I-77 high-occupancy managed lanes will provide a cost-efficient solution that will improve travel time reliability along this important corridor.”

Construction is anticipated to begin as early as December of this year, with an expected completion date in mid-2018.

Related Content

  • North Carolina DoT solicits transit projects for mobility fund grants
    March 27, 2012
    North Carolina Department of Transportation (NCDoT) has announced it is seeking projects to to receive its Mobility Fund grant which has an allocation of about US$45 million in fiscal 2012/2013 and $58 million in fiscal 2013/2014. All kinds of rail and bus transit projects are eligible to be submitted for consideration but the projects are required to have funds ready for construction within five years. Grants will be given to projects that are approved to be able to boost efficiency and mobility across the
  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • Kapsch preferred bidder on Ohio River Bridges toll project
    March 13, 2015
    The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
  • Pricing practise for HOT lane operation
    May 11, 2017
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure