Skip to main content

Mersey Gateway tests free flow tolling

Tolling specialist Emovis, which is to install and manage the toll system for the Mersey Gateway in the UK, is to test the technology on the Bridgewater Expressway prior to installation on the new bridge. The Mersey Gateway, a new six lane toll bridge over the Mersey between the towns of Runcorn and Widnes, is due to open in autumn 2017. The testing will be an important part of the preparation for the new free-flow tolling system, which will allow drivers to travel over the new bridge and the Silver J
October 24, 2016 Read time: 2 mins
Tolling specialist Emovis, which is to install and manage the toll system for the Mersey Gateway in the UK, is to test the technology on the Bridgewater Expressway prior to installation on the new bridge.

The Mersey Gateway, a new six lane toll bridge over the Mersey between the towns of Runcorn and Widnes, is due to open in autumn 2017.

The testing will be an important part of the preparation for the new free-flow tolling system, which will allow drivers to travel over the new bridge and the Silver Jubilee Bridge without slowing down to stop at a toll booth.

The actual test process won’t begin until much later in the year. No-one will be charged during the testing period and the number plate data collected will not be stored any longer than is needed for the test. Once the new bridge is open drivers will pay a toll to cross both bridges.

Related Content

  • September 24, 2013
    ICE pledges support for Mersey Gateway Project
    The Mersey Gateway Project in Liverpool, UK, has been endorsed by the UK’s most senior civil engineer, Nick Baveystock, director general of the Institution of Civil Engineers, on a trip to the area see the location of the new bridge and learn more about plans for the project. The centrepiece of the Mersey Gateway Project is a new six-lane toll bridge over the River Mersey. The existing Silver Jubilee Bridge will also be tolled as part of the project, which is expected to help create thousands of new jobs
  • August 8, 2016
    Tolling cameras being installed on Ohio rivers project
    Tolling won’t begin until late this year, but drivers may soon notice cameras in place on the toll gantry located at the north end of the Abraham Lincoln Bridge, near Court Avenue, on the Ohio Rivers Project in the US. Two cameras are scheduled to be installed for testing as part of preparations for the new RiverLink all-electronic tolling system. Tolling won’t begin until cross-river capacity is added to the system. That means either the improved Kennedy Bridge will be fully open to six lanes of I-65
  • July 22, 2015
    Countdown to Humber Bridge open-road tolling
    From early November 2015, the multi-million pound Humber Bridge project will introduce the UK's first electronic toll collection (ETC) and open-road tolling system to the bridge, enabling motorists who apply for a HumberTag account to pay the toll automatically using an electronic tag linked to a personal online account. The middle lanes of the bridge won’t have any booths and will be for account holders only – enabling drivers to cross the bridge without stopping. The outside lanes will still have booth
  • February 1, 2012
    No in-road equipment for Queensland's free flow toll bridge
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.