Skip to main content

MassDOT to start all electronic tolling in October

The Massachusetts Department of Transportation (MassDOT) is to move ahead with plans to completely demolish Interstate 90 toll plazas by the end of 2017 as a milestone in the state’s progress toward all electronic tolling (AET) along Interstate 90 (the Massachusetts Turnpike), the Tobin Bridge, and Boston tunnels. MassDOT has announced that AET will go live on 28 October and says the system will improve driver convenience and safety and reduce greenhouse gas-causing vehicle emissions. “When toll booths
August 25, 2016 Read time: 2 mins
The 7213 Massachusetts Department of Transportation (MassDOT) is to move ahead with plans to completely demolish Interstate 90 toll plazas by the end of 2017 as a milestone in the state’s progress toward all electronic tolling (AET) along Interstate 90 (the Massachusetts Turnpike), the Tobin Bridge, and Boston tunnels.
 
MassDOT has announced that AET will go live on 28 October and says the system will improve driver convenience and safety and reduce greenhouse gas-causing vehicle emissions.  “When toll booths have been removed, AET will allow drivers to maintain regular highway speed as they pass under AET gantries, eliminating the need for drivers to sharply reduce speed and idle in toll booth lines.

MassDOT is working with the Executive Office of Public Safety to establish clear policies for the use and retention of AET data and is in discussions with public safety officials about the very limited circumstances in which AET-generated ‘hot list’ or other information could be used in the case of public safety emergencies.

MassDOT officials estimate that the agency will save about US$5 million in annual operating costs with AET.  The cost of designing and building the physical AET system is about US$130 million and toll plaza removal and reconstruction, excluding the Sumner Tunnel, will cost about US$133 million.

Related Content

  • March 8, 2013
    Massachusetts plans all-electric tolling
    Massachusetts Department of Transportation (MassDOT) is committed to implementing all-electronic tolling (AET) by the middle of 2016; the Tobin Bridge will be converted first as a demonstration to familiarise the public, according to Frank DePaola, the state's highway administrator. The state is going all-electronic because with modern technology it's the most cost-effective way to collect tolls, and because it reduces delays to motorists and improves safety at toll points, he said. MassDOT has estimated it
  • August 20, 2013
    Massachusetts moves ahead on AET
    The Massachusetts Department of Transportation (MassDOT) has scheduled three public meetings to present all electronic tolling (AET) information and solicit comments from members of the public. MassDOT proposes to convert and replace the I-90 Western Turnpike and I-90 Boston Metropolitan Highway System interchange-based manual cash and electronic toll collection systems with a new system of tolling relying only on AET. The project will include both roadway tolling infrastructure and toll collection sys
  • March 28, 2013
    Massachusetts moves to cashless tolling
    Drivers in Massachusetts may no longer need to worry about having cash on hand as they hit toll roads. The Massachusetts Department of Transportation (MassDOT) is planning to replace every tollbooth in the state with electronic tolling systems that read E-ZPass transponders in cars and send monthly bills to drivers who use toll roads without passes. “We’re trying to look at doing things faster, more efficiently and provide more information to the public,” said MassDOT Highway Administrator Frank DePaola.
  • February 21, 2013
    New York State Thruway to go all electronic
    The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic. Although the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic. Work is now starting on the new bridge which under the contract