Skip to main content

Maine toll road evaluates AET

A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable. Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set
December 19, 2013 Read time: 2 mins
A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable.

Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set 2011 as the year for start on rebuild of the main south-end toll plaza designed to be an ORT plus cash plaza.  

April this year saw the beginning of ORT in some areas of the toll road and other ORT conversions of central lanes are planned, keeping some cash collection to each side. The cash toll collection system meanwhile is being replaced.

Cash continues to be the payment mode for some 37 per cent of transactions, and similar for Maine E-ZPass. The major growth in electronic tolling has come from travellers from outside with non-Maine E-ZPass transponders, now generating 25 per cent of transactions.

The new US$258m million ten year capital plan has US$123 million budgeted for bridge rehabilitation, US$70 million for pavement rehabilitation, $21 million for interchange improvements and US$19 million for immediate toll system upgrades.

Related Content

  • Tolling Matters: Open your eyes - see the possibilities
    September 27, 2022
    Diane Gutierrez-Scaccetti, commissioner of New Jersey DoT and IBTTA president 2022, talks to Adam Hill about the importance of mentoring young people - and why it's good to share pivotal experiences
  • GridMatrix goes back to the future in New York City
    September 25, 2023
    Legacy traffic management infrastructure doesn’t have to be a marker of the past: software upgrades can bring it into the present in a cost-effective and timely way, says Gordon Feller
  • Urban mobility and demand management - the Mobility Credits Model
    January 26, 2012
    Vito Marcolongo and Marco Troglia, Quaeryon srl describe the Mobility Credits Model, which is intended to combine inducements and fairness to improve mobility while reducing its more negative economic and environmental effects
  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle