Skip to main content

Maine toll road evaluates AET

A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable. Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set
December 19, 2013 Read time: 2 mins
A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable.

Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set 2011 as the year for start on rebuild of the main south-end toll plaza designed to be an ORT plus cash plaza.  

April this year saw the beginning of ORT in some areas of the toll road and other ORT conversions of central lanes are planned, keeping some cash collection to each side. The cash toll collection system meanwhile is being replaced.

Cash continues to be the payment mode for some 37 per cent of transactions, and similar for Maine E-ZPass. The major growth in electronic tolling has come from travellers from outside with non-Maine E-ZPass transponders, now generating 25 per cent of transactions.

The new US$258m million ten year capital plan has US$123 million budgeted for bridge rehabilitation, US$70 million for pavement rehabilitation, $21 million for interchange improvements and US$19 million for immediate toll system upgrades.

Related Content

  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser
  • Vancouver's metro transport promotes alternatives to driving
    January 26, 2012
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • The UK’s busiest crossing adopts free flow charging
    April 30, 2015
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a