Skip to main content

Maine toll road evaluates AET

A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable. Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set
December 19, 2013 Read time: 2 mins
A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable.

Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set 2011 as the year for start on rebuild of the main south-end toll plaza designed to be an ORT plus cash plaza.  

April this year saw the beginning of ORT in some areas of the toll road and other ORT conversions of central lanes are planned, keeping some cash collection to each side. The cash toll collection system meanwhile is being replaced.

Cash continues to be the payment mode for some 37 per cent of transactions, and similar for Maine E-ZPass. The major growth in electronic tolling has come from travellers from outside with non-Maine E-ZPass transponders, now generating 25 per cent of transactions.

The new US$258m million ten year capital plan has US$123 million budgeted for bridge rehabilitation, US$70 million for pavement rehabilitation, $21 million for interchange improvements and US$19 million for immediate toll system upgrades.

Related Content

  • European ideal poses local problems for toll companies
    December 16, 2013
    Being the first organisation attempting to implement an interoperable system poses challenges and increases risk that must be managed to realise the benefits. The European Electronic Toll Service (EETS) legislation aims to avoid the problems experienced in the USA and provide road users with seamless travel across the EU but it can pose big problems for some toll operators. Take, for instance, the case of the Humber Bridge in the UK. Its case was highlighted at the recent ITS World Congress by Tim Gammons,
  • Brazil opts for freeflow tolling
    April 9, 2014
    David Crawford explores the technical background of Brazil’s First multi-lane free-flow tolling system. The 2013 opening of Brazil’s first fully-operational, all-vehicle, multi-lane free-flow (MLFF) tolling system in the state of São Paolo has set the scene for a new phase of modern electronic fee collection (EFC) deployment in Latin America’s largest country. It has toll programmes at both federal and state levels, with São Paulo – the most populous state, with the largest road network – leading in the awa
  • Investigating charging methods for open road tolling
    January 30, 2012
    Toll system suppliers are considering service structures and technologies needed to address issues of social exclusion in open road tolling. Jason Barnes asked Telvent's Pat McGowan to explain moves to address the needs of all toll customers
  • More Americans relying on toll roads, says report
    July 3, 2015
    A new report issued by the International Bridge, Tunnel and Turnpike Association (IBTTA) in advance of the busy Fourth of July holiday travel season indicates that as Americans take to the roads this summer they will more often choose toll roads to get them to their destinations than in years past. The report, 2015 Report on Tolling in the US, reveals that the number of trips drivers have taken on tolls roads has increased 14 per cent over the last four years, rising from 5 billion trips in 2011 to 5.7 b