Skip to main content

Louis Berger to design interstate road modernisation in India

The National Highways Authority of India (NHAI) has selected Louis Berger to provide consultancy services for the preparation of detailed designs to upgrade around 7820 km of roads for two major road packages in southern India under the Bharatmala-Pariyojna scheme. The projects will include road widening and alignment; repaving; upgrades to intersections, bridges, bypasses and service roads; new toll plaza design; and improvements for more efficient traffic flow.
September 4, 2017 Read time: 1 min

The National Highways Authority of India (NHAI) has selected Louis Berger to provide consultancy services for the preparation of detailed designs to upgrade around 7820 km of roads for two major road packages in southern India under the Bharatmala-Pariyojna scheme.

The projects will include road widening and alignment; repaving; upgrades to intersections, bridges, bypasses and service roads; new toll plaza design; and improvements for more efficient traffic flow.

Louis Berger will first establish the technical, economic and financial viability of the current road modernisation projects. The firm will then prepare the design, carry out all necessary studies to support interstate four- or six-lane road and economic transport corridor development, and assess various funding options for the modernisation works.

Related Content

  • April 19, 2012
    Funding to modernise key areas of Sofia’s urban transport system
    The European Bank for Reconstruction and Development (EBRD) is planning to provide the Bulgarian capital of Sofia with a series of loans to support the modernisation of the city’s public transport system. The financial package of four loans worth a total of €24.96 million (US$35.6 million) will increase the quality, safety, accessibility and also the energy efficiency of transportation in the city.
  • June 12, 2024
    India aims nationwide switch to GNSS-based electronic toll collection
    Deadline is 22 July for companies wishing to put themselves forward for toll project
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • October 1, 2015
    TransCore to upgrade Delaware River bridge toll system
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.