Skip to main content

Key Russian PPP project

The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
April 18, 2012 Read time: 3 mins
RSSThe Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.

The WHSD is a key project for St Petersburg as it will help the city to develop its role as a major international transport hub. The new link is of major significance and will also be the first toll road operated within city limits in Russia, while it is Russia’s largest PPP project.

NCH’s bid proposes a minimal WHSD toll revenue guarantee of US$336.6 million/year (€234 million/year). Should the project revenue exceed this amount, NCH will pay 90% of the excess to the city. It is expected that once the road is open to traffic, toll revenues will soon reach the minimum income guarantee level. This would rule out the need for the city authorities to provide funds to support the project.

WHSD’s central section is the most technically complex to build part of the road and includes three bridges, two of which will feature a cable-stayed design, and a tunnel.

The expected investment is estimated by NCH at approximately $4.3 billion (€3 billion) and will be financed through a combination of debt and equity, as well as a federal grant of some $1.776 billion (€1.234 billion). The consortium has already received debt financing proposal from Russian banks VTB and Gazprombank and NCH hopes to sign the PP agreement with St Petersburg in December 2011. Infrastructure investment is one of VTB Capital’s strategic priorities. The Western High-Speed Diameter project is in line with VTB Capital’s plans to develop infrastructure projects in Russia utilising public-private partnership mechanisms. VTB Capital is also the lead investor in the Northern Capital Gateway consortium which has won the deal to modernise and operate Pukovo Airport in St Petersburg.

Meanwhile, construction of a complex of structures protecting St Petersburg from floods has now been completed. The complex is 25.4km long. The protective dam connects the Northern and Southern shores of the Gulf of Finland across Kotlin Island, with a road on the dam forming the last section of a ring road. Construction of the dam began in 1979 but work was interrupted when the project was 70% completed in 1987. Work resumed in 2005. The investment in the project stood at $34.36 million (€24.06 million) in the 1979-2005 period and $3.79 billion (€2.64 billion) since 2005.

Related Content

  • Hindhead Tunnel safety demonstration
    April 20, 2012
    A full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity.
  • IBTTA congratulates Anthony Foxx on his confirmation as DOT Secretary
    June 28, 2013
    The International Bridge, Tunnel and Turnpike Association (IBTTA) congratulated Anthony Foxx after the US Senate voted to confirm him as the next Secretary of the US Department of Transportation. Patrick D Jones, executive director and CEO of the worldwide association representing toll facility owners and operators and the businesses that serve them, said: “IBTTA congratulates Secretary Foxx on his confirmation today as the next US Secretary of Transportation. Secretary Foxx’s leadership comes at a time whe
  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • Traffic & Transport Information Design MSc course
    April 19, 2012
    The International Institute for Information Design (IIID), in cooperation with FH St. Poelten University of Applied Sciences, Austria, has announced Traffic & Transport Information Design, a five semester MSc course starting in October and which is based on distance teaching with blocked modules at the FH St.Poelten, Austria. Taught by top experts from more than 10 countries, the English-language based MSc Traffic&Transport Information Design course is being operated under the auspices of UNESCO.