Skip to main content

Key Russian PPP project

The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
April 18, 2012 Read time: 3 mins
RSSThe Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.

The WHSD is a key project for St Petersburg as it will help the city to develop its role as a major international transport hub. The new link is of major significance and will also be the first toll road operated within city limits in Russia, while it is Russia’s largest PPP project.

NCH’s bid proposes a minimal WHSD toll revenue guarantee of US$336.6 million/year (€234 million/year). Should the project revenue exceed this amount, NCH will pay 90% of the excess to the city. It is expected that once the road is open to traffic, toll revenues will soon reach the minimum income guarantee level. This would rule out the need for the city authorities to provide funds to support the project.

WHSD’s central section is the most technically complex to build part of the road and includes three bridges, two of which will feature a cable-stayed design, and a tunnel.

The expected investment is estimated by NCH at approximately $4.3 billion (€3 billion) and will be financed through a combination of debt and equity, as well as a federal grant of some $1.776 billion (€1.234 billion). The consortium has already received debt financing proposal from Russian banks VTB and Gazprombank and NCH hopes to sign the PP agreement with St Petersburg in December 2011. Infrastructure investment is one of VTB Capital’s strategic priorities. The Western High-Speed Diameter project is in line with VTB Capital’s plans to develop infrastructure projects in Russia utilising public-private partnership mechanisms. VTB Capital is also the lead investor in the Northern Capital Gateway consortium which has won the deal to modernise and operate Pukovo Airport in St Petersburg.

Meanwhile, construction of a complex of structures protecting St Petersburg from floods has now been completed. The complex is 25.4km long. The protective dam connects the Northern and Southern shores of the Gulf of Finland across Kotlin Island, with a road on the dam forming the last section of a ring road. Construction of the dam began in 1979 but work was interrupted when the project was 70% completed in 1987. Work resumed in 2005. The investment in the project stood at $34.36 million (€24.06 million) in the 1979-2005 period and $3.79 billion (€2.64 billion) since 2005.

Related Content

  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • Need for standardisation of toll classes
    March 2, 2012
    In a previous article Bob Lees of Idris Technology Ltd looked at the appropriateness of toll classes in relation to all-electronic toll fee collection. Here, he looks at how addressing classification standardisation could avoid downstream aggravation and cost
  • Video enforcement added to all New Hampshire toll lanes
    April 24, 2015
    The New Hampshire Department of Transportation (NHDOT) is to install video enforcement cameras on all toll lanes on the NH turnpike system in a bid to deter non-payment of tolls. Enforcement cameras have previously existed in all the dedicated E-Z Pass lanes and open road tolling (ORT) lanes. As part of the last phase of the new lane system installation project, enforcement cameras will be installed in all remaining toll lanes. The change is set to be implemented around the end of April and will be compl
  • PB names global chief operating officer
    June 14, 2012
    Parsons Brinckerhoff has named Greg Kelly to the newly created position of global chief operating officer (COO). Clifford Eby succeeds Kelly as president of Parsons Brinckerhoff’s Americas Transportation operating company. “The COO position is being created to ensure the continued success of each of our operating companies and to enhance their abilities to work together across our expanding global operations,” said George J. Pierson, president and CEO of Parsons Brinckerhoff. “Greg Kelly has led our large