Skip to main content

Key airport link open in US

The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor
May 17, 2012 Read time: 2 mins
The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route.

This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area.

Customers using the Airport Connector pay the toll at the Pocahontas 895 Main Plaza, including those traveling to and from Chesterfield County. The do not pay again at the Airport Connector ramps. Only customers using the Airport Connector and traveling between the airport and Interstate 295 will pay $1.25 at the ramp linking the connector to Pocahontas 895. This toll will be collected electronically, with payment made by E-ZPass or Visa/Mastercard credit or debit cards.

600 Transurban operates and maintains Pocahontas 895 and financed and constructed the Airport Connector Road as part of a public-private partnership with 1747 Virginia Department of Transportation established in 2006. The project cost close to US$50 million but did not require funding from Virginia taxpayers and was supported through a loan provided by the US Federal Government and backed by Transurban.

The link was needed to handle increasing traffic volumes. Over the last decade, Richmond International Airport has been one of the fastest-growing airports in the US. Construction of the new road, designed and built by American Infrastructure, was completed approximately two months early. The project, which began construction in early 2009, boasted more than 665 days without a lost-time accident, the entire two-year length of the project.

Pocahontas 895 is a 14km toll road with an elevated bridge crossing the James River. It is located southeast of Richmond, Virginia, and links Interstate 95 at Chippenham Parkway (Route 150) with Interstate 295 to create a southeastern bypass of the city. It is the only crossing of the James River for 10km in either direction. The new road features sophisticated electronic tolling technology, which helps speed vehicle flow through the tolling area.

For more information on companies in this article

Related Content

  • Norway gets ready for more EVs
    September 14, 2021
    Norway’s road transport network is changing radically. The country is gearing up for greater electric vehicle use as well as gradually phasing out its traditional ferry links
  • Flowbird digital parking options for Pennsylvania borough
    February 14, 2024
    Carlisle residents can access mobile payment app, pay-by-text and extend-by-text
  • Underinvestment in infrastructure threatens economic growth
    January 24, 2012
    The 2011 Urban Mobility Report from the Texas Transportation Institute highlights the dangers of continued underinvestment in transportation infrastructure but also offers some hope in terms of possible solutions
  • EETS: still struggling to become reality
    December 4, 2013
    Erich Erker, Norbert Schindler, Peter Tschulik from Siemens Electronic Tolling examine the barriers to EETS deployment. Tolling in Europe was introduced to pay for the construction and operation of individual tunnels, bridges and highways and has evolved in major steps. The original manual tolling systems were highly disruptive to traffic flow and required the creation of large toll plazas, with multiple lanes and toll booths to ensure an acceptable throughput. With the introduction of Dedicated Short Range