Skip to main content

Key airport link open in US

The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor
May 17, 2012 Read time: 2 mins
The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route.

This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area.

Customers using the Airport Connector pay the toll at the Pocahontas 895 Main Plaza, including those traveling to and from Chesterfield County. The do not pay again at the Airport Connector ramps. Only customers using the Airport Connector and traveling between the airport and Interstate 295 will pay $1.25 at the ramp linking the connector to Pocahontas 895. This toll will be collected electronically, with payment made by E-ZPass or Visa/Mastercard credit or debit cards.

600 Transurban operates and maintains Pocahontas 895 and financed and constructed the Airport Connector Road as part of a public-private partnership with 1747 Virginia Department of Transportation established in 2006. The project cost close to US$50 million but did not require funding from Virginia taxpayers and was supported through a loan provided by the US Federal Government and backed by Transurban.

The link was needed to handle increasing traffic volumes. Over the last decade, Richmond International Airport has been one of the fastest-growing airports in the US. Construction of the new road, designed and built by American Infrastructure, was completed approximately two months early. The project, which began construction in early 2009, boasted more than 665 days without a lost-time accident, the entire two-year length of the project.

Pocahontas 895 is a 14km toll road with an elevated bridge crossing the James River. It is located southeast of Richmond, Virginia, and links Interstate 95 at Chippenham Parkway (Route 150) with Interstate 295 to create a southeastern bypass of the city. It is the only crossing of the James River for 10km in either direction. The new road features sophisticated electronic tolling technology, which helps speed vehicle flow through the tolling area.

For more information on companies in this article

Related Content

  • Florida's free flow tolling eases congestion, improves safety
    July 24, 2012
    A decade since Florida's Turnpike Enterprise first deployed electronic toll collection, the organisation's Director of Toll Operations Rick Nelson and Tom S. Knuckey of PBS&J look at progress. A decade on from the deployment of Florida's Turnpike Enterprise's state-wide SunPass pre-paid Electronic Toll Collection (ETC) programme, transponder sales have ballooned from 5,000 to more than 4,000,000. Over 70 per cent of the state's turnpike drivers participate in the system and transponder sales continue to gro
  • Transurban and VDOT announce two Express Lanes extensions
    November 26, 2015
    Australia-based Transurban and the Virginia Department of Transportation have announced extensions to the I-95 and I-395 in Northern Virginia. The 395 Express Lanes project will convert the existing two I-395 high occupancy vehicle (HOV) lanes into three Express Lanes and extend the current dynamic tolling and traffic management system. It also involves an extension to the 95 Express Lanes for 11 kilometres north to the Washington DC border. Transurban has also announced an in-principle agreement VDOT
  • Open road tolling: safer with less congestion
    January 30, 2012
    Michael J. Davis of PBS&J looks at the positive effect that open road tolling can have on safety
  • Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    September 21, 2015
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing