Skip to main content

Kapsch TrafficCom wins PANYNJ toll system contract

The Port Authority of New York and New Jersey (PANYNJ) has awarded Kapsch TrafficCom a US$147 million contract to replace all roadside equipment in the mixed-mode, dedicated mode and express toll lanes at all bridges and tunnels managed by Authority. Under the first collaborative project between Kapsch TrafficCom and its recently-acquired Schneider Electric transportation business division, Kapsch will replace the toll collection system at PANYNJ’s bridge and tunnel facilities, as well as carry out ongoi
July 26, 2016 Read time: 2 mins
The Port Authority of New York and New Jersey (PANYNJ) has awarded 4984 Kapsch TrafficCom a US$147 million contract to replace all roadside equipment in the mixed-mode, dedicated mode and express toll lanes at all bridges and tunnels managed by Authority.

Under the first collaborative project between Kapsch TrafficCom and its recently-acquired 729 Schneider Electric transportation business division, Kapsch will replace the toll collection system at PANYNJ’s bridge and tunnel facilities, as well as carry out ongoing system maintenance upon completion of the new toll system installation.

The initial contract is for the design and implementation of the replacement toll collection system at PANYNJ’s six bridge and tunnel facilities. Once completed, Kapsch will maintain the system for a six-year period, with options to extend for up to three two-year periods.

The initial work will commence in August 2016, with all toll collection system equipment to be replaced by the end of 2020.

For more information on companies in this article

Related Content

  • Chile opts for Q-Free’s free flow tolling
    August 25, 2015
    Q-Free is to supply its single gantry multi lane free flow tolling system to Sociedad Concesionaria Vespucio Norte Express, Chile. The order, valued at around US$4 million, is for the design and installation of the renewal of an existing electronic toll collection system in Santiago and includes an initial three-year service and maintenance period, which the customer has the option to renew for a further seven years. Delivery is due to be completed by the end of 2017. “We are pleased to receive this o
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • Three for Q-Free in the US
    May 1, 2025
    Kinetic Mobility will be used in Denver, Washington DC and Dallas-Fort Worth
  • Rapid growth makes Texas an incubator for tolling innovation
    September 8, 2014
    As the IBTTA’s annual meeting and exhibition heads for Austin, Mitchell Beer, president of Smarter Shift, considers the role of Texas in the development of tolling strategies and technology. The State of Texas has always prided itself on being ‘larger than life’. From the sprawling geography of the state itself with its wide open skies, to its entrepreneurial ‘get-it-done’ attitude, Texas exudes an impatient restlessness that pushes businesses and public agencies to deliver faster, better results. More ofte