Skip to main content

Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges

Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As
May 14, 2015 Read time: 2 mins
4984 Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB).

The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As a cooperative project between the two states, the initiative represents a joint commitment to improving the region’s transportation system by alleviating congestion, increasing safety and mobility, and stimulating economic development.

The LSIORB tolling system will enable the use of toll tags operating on the ISO 18000 6C protocol, as well as E-ZPass TDM protocol-based transponders, giving customers the option to purchase a toll tag for local use or for travel within an out-of-state toll network. Compatibility with these two systems makes the LSIORB project as an important milestone in tolling interoperability, as it facilitates mobility for motorists and for toll operators between regions by using shared technologies.

The initial project scope includes the addition of tolling infrastructure to the soon-to-be-completed New Downtown Bridge and the East End Bridge, as well as to the existing Kennedy Bridge, which will be temporarily closed and renovated to increase capacity across the Ohio River and improve mobility in the Louisville-Southern Indiana region. Kapsch will design the tolling equipment and software, provide customer account management systems, oversee transponder distribution, and maintain customer service operations and walk-in retail centres.

Kapsch will manage the project from its local office located in the Louisville-Southern Indiana area.  The bridges are set to open for tolling by the end of 2016.

For more information on companies in this article

Related Content

  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • Potential game-changing MoU on tolling and ITS market cooperation for North America
    February 2, 2012
    Kapsch TrafficCom IVHS Corporaton and Federal Signal Corporation have entered into a Memorandum of Understanding after substantial discussions during the past few months regarding ways in which the two organisations might cooperate and jointly pursue mutual business interests in North America.
  • California approves 6C electronic toll collection protocol
    December 6, 2017
    California’s Office of Administrative Law has issued a notice of approval of regulatory changes to adopt the ISO 18000-63 (6C) electronic toll collection (ETC) protocol on all roads throughout the state, from January 2019. According to Patrick Jones, chief executive officer of the International Bridge, Tunnel and Turnpike Association (IBTTA), the action helps to advance plans for achieving nationwide interoperability (NIOP). In addition, It also allows states using 6C to become interoperable with each other
  • Bi-State board votes to restart tolling services procurement
    October 28, 2014
    The Kentucky-Indiana Joint Board for the Ohio River Bridges Project has voted to restart the procurement of a tolling services provider. The vote comes after the Indiana Finance Authority’s review of a protest submitted by a non-winning bidder in late September. The Joint Board heard from the IFA that the allegations made in the protest were unsubstantiated, but the agency did uncover a significant potential personal and organisational conflict of interest regarding financial arrangements between a subc