Skip to main content

Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges

Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As
May 14, 2015 Read time: 2 mins
4984 Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB).

The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As a cooperative project between the two states, the initiative represents a joint commitment to improving the region’s transportation system by alleviating congestion, increasing safety and mobility, and stimulating economic development.

The LSIORB tolling system will enable the use of toll tags operating on the ISO 18000 6C protocol, as well as E-ZPass TDM protocol-based transponders, giving customers the option to purchase a toll tag for local use or for travel within an out-of-state toll network. Compatibility with these two systems makes the LSIORB project as an important milestone in tolling interoperability, as it facilitates mobility for motorists and for toll operators between regions by using shared technologies.

The initial project scope includes the addition of tolling infrastructure to the soon-to-be-completed New Downtown Bridge and the East End Bridge, as well as to the existing Kennedy Bridge, which will be temporarily closed and renovated to increase capacity across the Ohio River and improve mobility in the Louisville-Southern Indiana region. Kapsch will design the tolling equipment and software, provide customer account management systems, oversee transponder distribution, and maintain customer service operations and walk-in retail centres.

Kapsch will manage the project from its local office located in the Louisville-Southern Indiana area.  The bridges are set to open for tolling by the end of 2016.

For more information on companies in this article

Related Content

  • CTS to expand contactless in NYC
    February 9, 2021
    Payment options will include a mobile app, digital wallets and tap-in bank cards 
  • Sanef awarded major Dartford Crossing toll contract
    October 7, 2013
    The UK Highways Agency has awarded the US$589 million contract for the design, implementation, delivery and operation of the new free-flow charging system to sanef. The seven-year deal includes the opportunity to extend up to a further three years. New technology will allow drivers to use the crossing without having to stop at the barriers to hand over payment. Road users will be able to pay through a variety of methods including telephone, text, online and at retail outlets. Pre-paid accounts which qual
  • Rosa Rountree calls for clarity and consistency
    December 16, 2015
    Rosa Rountree campaigns for accurate and consistent figures for the tendering of tolling concessions. If there is one thing about which Rosa Rountree is passionate, it’s numbers. That’s not surprising for a graduate accountant, but it is not only the quarterly accounts that concern the CEO and president of Egis Projects USA.
  • Effortless mobility for everyone
    September 10, 2021
    To improve the way we move people around, a lot of stakeholders are going to need to start cooperating and aligning, suggests Edwin van den Belt, software architect at Dat.mobility