Skip to main content

Kapsch TrafficCom to provide toll system the Louisville-Southern Indiana Ohio River Bridges

Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB). The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As
May 14, 2015 Read time: 2 mins
4984 Kapsch TrafficCom North America has been awarded a US$41 million contract by the Indiana Finance Authority (IFA) to provide the toll system for the Louisville-Southern Indiana Ohio River Bridges (LSIORB).

The comprehensive project includes the installation, integration, operation, and maintenance of an end-to-end open road toll collection system, as well as back office system and customer service centre operation at the three bridges that will connect Louisville, Kentucky and Jeffersonville, Indiana. As a cooperative project between the two states, the initiative represents a joint commitment to improving the region’s transportation system by alleviating congestion, increasing safety and mobility, and stimulating economic development.

The LSIORB tolling system will enable the use of toll tags operating on the ISO 18000 6C protocol, as well as E-ZPass TDM protocol-based transponders, giving customers the option to purchase a toll tag for local use or for travel within an out-of-state toll network. Compatibility with these two systems makes the LSIORB project as an important milestone in tolling interoperability, as it facilitates mobility for motorists and for toll operators between regions by using shared technologies.

The initial project scope includes the addition of tolling infrastructure to the soon-to-be-completed New Downtown Bridge and the East End Bridge, as well as to the existing Kennedy Bridge, which will be temporarily closed and renovated to increase capacity across the Ohio River and improve mobility in the Louisville-Southern Indiana region. Kapsch will design the tolling equipment and software, provide customer account management systems, oversee transponder distribution, and maintain customer service operations and walk-in retail centres.

Kapsch will manage the project from its local office located in the Louisville-Southern Indiana area.  The bridges are set to open for tolling by the end of 2016.

For more information on companies in this article

Related Content

  • FDOT to rebuild major segment of I-4
    September 10, 2014
    US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
  • Vendor's eye view of US economic stimulus programme
    March 12, 2012
    Pete Goldin explores the impact of the US economic stimulus programme on the ITS industry from the ITS vendor perspective
  • Emovis AET keeps Ritba moving
    October 24, 2022
    Firm builds on existing relationship with Rhode Island Turnpike and Bridge Authority  
  • FDOT to award Florida I-4 Ultimate project
    April 24, 2014
    The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d