Skip to main content

Kapsch signs deal to maintain tolling on Øresund bridge

Contract will run from February 2026 to January 2031 and could be worth up to €6m
By Adam Hill May 15, 2024 Read time: 1 min
The iconic Oresund bridge connects Denmark and Sweden (© Aleksandr Bondarchiuk | Dreamstime.com)

Kapsch TrafficCom has extended its maintenance support for the tolling operation on the Øresund bridge until 2031.

The iconic structure - which featured in international TV hit crime drama The Bridge - runs between the Copenhagen and Malmo metro areas, connecting Denmark and Sweden.

The bridge is 8km (five miles) long and carries 600,000 vehicles each month. Kapsch will deliver ongoing maintenance of the existing tolling roadside system, including cameras and other sensors. 

Kapsch's new deal, which also includes point-of-sales software and hardware, is set to run from February 2026 until January 2031 and is worth between  €3 million and  €6m, "depending on upcoming change requests", the firm says.

Michael Weber, head of sales EMENA at Kapsch TrafficCom, says the hundreds of thousands of vehicles passing each month show the bridge is "a significant positive factor of integration of the two regions".

Related Content

  • February 12, 2021
    Kapsch remedies 'unfair' tolling in Greece 
    Any overpaid costs will be credited to the driver's account, firm says 
  • February 18, 2014
    Kapsch TrafficCom awarded Texas tollway extension project
    Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners Segments 3 LLC to provide the toll collection, intelligent transportation and network communication systems for the NTE extension project. The NTE extension is approximately ten miles long, and runs along I-35W north of the city of Fort Worth. Kapsch will deliver ten all-electronic toll zones, including dynamic sign equipment and road sensors that provide the data to enable dynamic toll charges based upon actual traffic
  • June 6, 2014
    App informs drivers of delays during Long Beach bridge replacement
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • October 6, 2020
    Q-Free extends Norway tolling deal
    National back office operation handles one billion transactions per year