Skip to main content

Kapsch preferred bidder on Ohio River Bridges toll project

The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
March 13, 2015 Read time: 2 mins
RSSThe Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected 81 Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project.
 
Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value.
 
Kapsch TrafficCom's proposal estimate was US$41.5 million, well below the amount independent experts’ estimate for similar tolling services. The contract, if approved, will cover the cost of a collection system and the cost to manage and operate the tolling system. The length of the contract is seven years, with the option for the states to extend for a single two-year period.

This is the second time the board has selected Kapsch for the project, as Ohio River Bridges Project officials withdrew their agreement with the company last fall over conflict-of-interest concerns with one of the company’s subcontractors.
 
Indiana is leading the procurement on behalf of both states, and a public hearing will take place on 26 March to hear public comment about the selected proposal and contract, and the proposal-evaluation process. The IFA will use the public comment to make its final determination in recommending the preferred tolling operator to receive approval consideration from Governor Mike Pence and review by the Indiana State Budget Committee.

Related Content

  • October 12, 2015
    Portuguese toll expertise for US toll system
    The Southern Connector Toll Road in South Carolina, US, has awarded a five-year contract to BIT Mobility Solutions, a subsidiary of Portuguese group Brisa, to implement anew back office system for improved effectiveness and efficiency in revenue collection and to minimise toll violations. The US$2 million contract involves integration of legacy components and supply of new subsystems and includes: integration services, digital cameras, vehicle classification system, lane controllers, licence plate recog
  • August 5, 2013
    Travel times halve for tolling converts
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • February 18, 2014
    Kapsch TrafficCom awarded Texas tollway extension project
    Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners Segments 3 LLC to provide the toll collection, intelligent transportation and network communication systems for the NTE extension project. The NTE extension is approximately ten miles long, and runs along I-35W north of the city of Fort Worth. Kapsch will deliver ten all-electronic toll zones, including dynamic sign equipment and road sensors that provide the data to enable dynamic toll charges based upon actual traffic
  • January 6, 2016
    Varying acceptance of tolling in Africa
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.