Skip to main content

Kapsch preferred bidder on Ohio River Bridges toll project

The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
March 13, 2015 Read time: 2 mins
RSSThe Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected 81 Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project.
 
Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value.
 
Kapsch TrafficCom's proposal estimate was US$41.5 million, well below the amount independent experts’ estimate for similar tolling services. The contract, if approved, will cover the cost of a collection system and the cost to manage and operate the tolling system. The length of the contract is seven years, with the option for the states to extend for a single two-year period.

This is the second time the board has selected Kapsch for the project, as Ohio River Bridges Project officials withdrew their agreement with the company last fall over conflict-of-interest concerns with one of the company’s subcontractors.
 
Indiana is leading the procurement on behalf of both states, and a public hearing will take place on 26 March to hear public comment about the selected proposal and contract, and the proposal-evaluation process. The IFA will use the public comment to make its final determination in recommending the preferred tolling operator to receive approval consideration from Governor Mike Pence and review by the Indiana State Budget Committee.

Related Content

  • January 29, 2015
    Tolls to help fund improvements to the Brent Spence Bridge
    The International Bridge, Tunnel and Turnpike Association (IBTTA) has applauded Governors Beshear (Kentucky) and Kasich (Ohio) following their announcement that they plan to use tolls to pay for at least part of the US$2.63 billion Brent Spence Bridge replacement. Brent Spence Bridge is a double deck, cantilevered truss bridge that carries Interstates 71 and 75 across the Ohio River between Covington, Kentucky and Cincinnati, Ohio. Originally designed to carry 80,000 vehicles per day, approximately 172,0
  • January 27, 2012
    Kapsch wins 10-year E-ZPass contract
    Kapsch TrafficCom IVHS has been selected by the E-ZPass Group, a coalition of 24 toll agencies in 14 US states, as vendor for a new 10-year technology and services contracts, subject to individual agency approval processes.
  • March 2, 2015
    Texas toll road contract awarded
    The Texas Transportation Commission has awarded a contract to the Blueridge Transportation Group for the the planning, construction, financing, operation and maintenance of an express toll road and additional infrastructures for the SH 288 toll lanes project in Harris County in Texas. The consortium includes Israel-based Shikun & Binui Holdings, together with an infrastructure contractor and a financial investor. The ten mile stretch of road will connect Harris County to Houston. The project includes constr
  • October 1, 2015
    TransCore to upgrade Delaware River bridge toll system
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.