Skip to main content

Kapsch preferred bidder on Ohio River Bridges toll project

The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
March 13, 2015 Read time: 2 mins
RSSThe Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected 81 Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project.
 
Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value.
 
Kapsch TrafficCom's proposal estimate was US$41.5 million, well below the amount independent experts’ estimate for similar tolling services. The contract, if approved, will cover the cost of a collection system and the cost to manage and operate the tolling system. The length of the contract is seven years, with the option for the states to extend for a single two-year period.

This is the second time the board has selected Kapsch for the project, as Ohio River Bridges Project officials withdrew their agreement with the company last fall over conflict-of-interest concerns with one of the company’s subcontractors.
 
Indiana is leading the procurement on behalf of both states, and a public hearing will take place on 26 March to hear public comment about the selected proposal and contract, and the proposal-evaluation process. The IFA will use the public comment to make its final determination in recommending the preferred tolling operator to receive approval consideration from Governor Mike Pence and review by the Indiana State Budget Committee.

For more information on companies in this article

Related Content

  • Kapsch to maintain UK rail GSM-R network
    December 17, 2012
    Austrian rail telecommunication systems integrator Kapsch CarrierCom has been awarded the contract to maintain the entire GSM-R (Global System for Mobile Communications – Railway) network on behalf of British railway infrastructure operator Network Rail. The multi-year agreement will see Kapsch supporting Network Rail’s control centre team to ensure the highest levels of network availability, enabling higher frequency of train services and greater safety standards. GSM-R is an international wireless communi
  • New York to start congestion charging 'from January 2025'
    November 15, 2024
    Final approval for delayed scheme still required as $15 toll lowered to $9
  • Idaho finds the right formula for winter maintenance
    August 5, 2013
    Idaho’s use of key performance indicators to determine the effectiveness of its winter maintenance programme put it on the Best of ITS America shortlist. Idaho Transportation Department’s budget for winter maintenance is more than $25m – almost half of which is spent on snowplough operations. The State’s geography ranges from desert to mountains and Idaho Transportation Department (ITD) has a 500+ strong winter maintenance fleet to undertake snowploughing and spreading salt, salt brine, magnesium chloride a
  • Carrots are proving cost-effective in Netherlands
    October 3, 2018
    There are lessons to be learned from congestion avoidance schemes in the Netherlands. David Crawford welcomes some new thinking in road pricing. Highway operators worldwide are being urged to learn from Dutch experience in using financial carrots rather than sticks to encourage drivers to avoid contributing to congestion. A Netherlands/UK group makes a convincing cost/benefit case in a new global survey of road pricing technologies, economics and acceptability. Representing the Rijkswaterstaat section of